Smithland Hydroelectric Power Plant, United States of America
Smithland Hydroelectric Power Plant, United States of America
Images
1
/
6
Project data
Location: Smithland, United States
Construction of a hydroelectric power plant with 3 horizontal bulb turbines and a total capacity of 72 MW
Reinforced concrete construction: 78 m long, 62 m wide, 32 m high
Massive component dimensions (slab thickness > 4.00 m)
Requirements
Extremely tight construction schedule of 18 months, resulting in simultaneous realization of the three turbine tubes and other components
Massive components with long utilization period of formwork and scaffolding resulting in high material requirements (provision for some areas 100 %)
Very complex forms, in particular for the turbine tubes as well as the intake structure with varying cross-sections
Very strict guidelines regarding the dimensional accuracy
Customer
CJ Mahan Construction Company, Grove City, OH
Customer's benefit
Saving of anchors through the use of the single-sided SCS climbing formwork
Optimal adjustment of the supporting structures for all areas due to the high degree of flexibility of the VARIOKIT system components - from the units to the heavy-duty shoring tower
Acceleration of the assembly and construction time on-site due to the pre-assembled formwork and scaffolding units
Highest dimensional accuracy of the concrete structure through stationary prefabrication of the 3D formwork units
Reduction of interfaces through the entire construction process thanks to formwork, scaffolding and engineering from one source
Continuous support provided for the construction management during the whole execution phase
PERI solution
Development of a comprehensive concept for the formwork and scaffolding technology while taking into account all project requirements as well as budget and schedule considerations
3D planning of multi-curved formwork units for the complex forming of the tubes for the turbines
Dimensionally accurate realization and delivery of the 3D formwork units
Delivery of the elements in pre-assembled units
Continuous coordination of all formwork and scaffolding processes through a PERI project manager on site