Water Infrastructure Project

Project data

Location: West, Singapore

Water Infrastructure

A water infrastructure project consisting of a 37 m deep shaft, together with a 280 m long and 15 m deep detention wall tank that has a 3 different layer of wall thickness.

Working on a confined space with limited assembly area of the 37 m deep shaft are made possible with GRV Articulated Waler Circular Formwork and RCS Rail Climbing systems as it allows fast and safe casting of the circular walls. Furthermore, PERI UP Flex Stair 75 is used in the shaft as it allows comfortable head clearance for the workers to access the access tower.

Requirements

  • Circular Shaft
  • Rectangular Wall

Customer

Main Contractor – Lian Soon Construction Pte Ltd

Sub Contractor – Ed. Züblin AG (Singapore Branch)

Customer's benefit

  • Reduce number of hoisting and shuttering time
  • Fast and safe cast of the circular walls
  • Allows comfortable head clearance

PERI solution

  • GRV Articulated Waler Circular Formwork system allows fast and safe casting of the circular walls
  • PERI UP Flex Stair 75 allows comfortable head clearance for the workers to access the access tower
  • To design the big wall panel, PERI UP Rosett Modular Scaffold, CB 160 / 240 Climbing Platform and VARIO GT 24 Girder Wall Formwork systems are used for the detention tank wall