Water Infrastructure
A water infrastructure project consisting of a 37 m deep shaft, together with a 280 m long and 15 m deep detention wall tank that has a 3 different layer of wall thickness.
Working on a confined space with limited assembly area of the 37 m deep shaft are made possible with GRV Articulated Waler Circular Formwork and RCS Rail Climbing systems as it allows fast and safe casting of the circular walls. Furthermore, PERI UP Flex Stair 75 is used in the shaft as it allows comfortable head clearance for the workers to access the access tower.
Main Contractor – Lian Soon Construction Pte Ltd
Sub Contractor – Ed. Züblin AG (Singapore Branch)