Top Pave

Project data

Location: Tuas, Singapore

Factory
3 storeys
Project duration: 4 months

Requirements

  • Slabs
  • Columns
  • Lift core walls

Customer

Top Pave Pte Ltd

Mr Cheong Weng Wah
Project Director

The product itself is rigid and safe to use and easy to assemble. The back-up services and the on-site advice by the Formwork Instructor is very good. We would recommend PERI to any other contractors.

PERI solution

  • CB Climbing Formwork was used for the lifts shaft
  • PD 8 Table form saves time needed for assembly