T219 Orchard Station

Project data

Location: Orchard Road, Singapore

Expected Completion Date: Q4 2020

Located adjacently to Singapore’s highly-recognizable premier mall, ION Orchard, T219 Orchard Station will be an interchange train station connecting both Thomson-East Coast Line and North-South Line. It took 2 years of excavation works to complete a 28 m depth below existing ground level of the underground train station. Both PERI UP Flex and DUO systems are used for the construction works for this project.

Requirements

  • Roof Slab
  • Internal Shear Wall

Customer

Main Contractor – Penta-Ocean Construction Pte Ltd

Sub Contractor – Interno Engineering (1996), Pte Ltd

Customer's benefit

Save 50% of manpower, cycle and assembly time respectively.

PERI solution

  • DUO - Narrow walkway's wall
  • PERI UP Flex - Internal shear wall / Roof slab