Sixth Avenue MRT Station

Project data

Location: Downtown Line, Singapore

Underground MRT Station

It connects the north-western and eastern regions of Singapore

Completion time:  2016

Requirements

  • Beams
  • Walls
  • Station platform
  • Concourse
  • Roof slab

Customer

McConnell Dowell SEA Pte Ltd

Customer's benefit

  • Flexibility
  • Efficiency
  • Reliability
Mr. Barry Mclean
Construction Manager

PERI has provided a professional service from the outset. Their VARIO and DOMINO systems are easy to use, flexible, and cost effective; they also improve the appearance of the site in terms of organization and housekeeping when compared to conventional formwork. The PERI design support has helped overcome potential problem areas that have helped maintain the progress of the project.

PERI solution

  • DOMINO panel formwork: The lightweight wall panels can be assembled with minimum crane assistance
  • For the construction of the station platform, concourse, and roof slab, ST 100 stacking tower is being used. This heavy-duty shoring system together with the MULTIPROP slab props enable the site to cast beams up to a height of 5.10m and 2.00m thick slabs.DOMINO panel formwork: The lightweight wall panels can be assembled with minimum crane assistance