Two residential buildings each with 8 storeys, with a total of 91 housing units on the area of the former North Station in Vienna
Walls, columns and slabs constructed using in-situ concreting operations
Universale Hochbau, Trumau
With SKYDECK, we have exactly the right slab formwork system for our construction project – the drophead for early striking as well as the simple and easy handling have really convinced us. And the MAXIMO wall formwork is 25 per cent faster than conventional panel formwork systems; the one-sided anchoring in particular saves a great deal of time.