JTC Chemical Hub

Project data

Location: Tuas South, Singapore

Completion date: February 2016
Construction duration: 5 months

JTC Chemical Hub consists of Block A and Block B.

Requirements

  • Slabs
  • Lift cores
  • Columns

Customer

Tat Hin Builders Private Limited

Customer's benefit

  • Fast moving cycles
  • Easy assembly
  • Safe procedures
  • Deatiled drawings

PERI solution

  • Together with Tat Hin Builders, PERI managed the challenge of casting the Sprinkler tank having a 600 x 600 mm opening after casting the whole structure
  • PERI UP Rosett Shoring Tower system was used due to the ability to be disassembled to small parts which easily could be removed through the manhole opening