T208 Springleaf MRT Station

Project data

Location: Upper Thomson Road, Singapore

Expected Completion Year: 2017

Underground MRT Station

Springleaf is a future underground MRT Station of the new Thomson-East Coast Line in Singapore that will be located next to the two-storey shophouses along Upper Thomson Road. Once completed, this station will serve the neighbourhood of Springleaf and Nee Soon Army Camp.

The station is expected to be open to public by 2020.

Requirements

  • Formwork for single sided walls
  • Shoring for slabs (up to thickness of 1.8 m and height of up to 13 m)

Customer

Main Contractor: Leighton – John Holland

Sub Contractor: Chian Teck Realty Pte. Ltd.

Customer's benefit

  • Fast and safe erection of ST 100 Stacking Towers
  • Good concreting finishes and productive cycle times using both SB Brace frames and VARIO GT 24 Girder Wall Formwork as together
Mr Liu Jian Zhong
General Manager of Chian Teck Realty Pte. Ltd.

PERI provides us with of high quality systems as well as good technical and delivery support. With PERI systems, the casting cycle is 5 days faster than casting with a conventional product. Even with a tight schedule, they are able to accomodate our request and deliver materials on time.

PERI solution

  • With ST 100 Stacking Tower that has been designed for fast assembly and each application height can be easity planned with only one frame size, they are able to cast one of the slab height of 30 m high from the platform to the roof of the basement.
  • Due to the nature of the skin walls, SB Brace Frames with VARIO GT 24 Girder Wall Formwork are used for the construction. As SB Brace Frames are very versatile, using the combination of both SB Brace Frames and VARIO GT 24 Wall Formwork, does not required form ties. It gives a good concreting finishes and a productive cycle time.