![PERI's CB Climbing Formwork in use on the Oval Village project. PERI supported Statom Group on this project. The climbing system offers time-saving operations, with the ability to move secure units comprising formwork and platforms in only one crane lift.](https://cdn.peri.cloud/.imaging/mWide/dam/36da9b28-58d2-4da1-820f-ca8c890b45f1/74924/peri-s-cb-climbing-formwork-in-use-on-the-oval-village-project.jpg)
Latest News & Releases
01
Aug
![New Pumarejo Bridge, Barranquilla/Atlántico, Colombia The new Puente Pumarejo in Latin American has a length of 2.3 km. The complex-shaped pylons rise up to a height of 80 m.](https://cdn.peri.cloud/.imaging/mWide/dam/f6d3d22a-be0a-4ec2-9517-d1b470e24ada/73217/new-pumarejo-bridge-barranquilla-atl%C3%A1ntico-colombia.jpg)
![New Pumarejo Bridge, Barranquilla/Atlántico, Colombia Perfectly matched to suit the formwork solution, PERI UP Flex Shoring Towers and ST 100 Stacking Towers formed high load-bearing supporting constructions with heights between 5 m and 22 m in the bridge edge areas. PERI UP also served to provide stair access in order to safely reach the higher working levels.](https://cdn.peri.cloud/.imaging/mWide/dam/eff894a6-2508-48f9-8100-4c37a8aa22ae/73218/new-pumarejo-bridge-barranquilla-atl%C3%A1ntico-colombia.jpg)
![New Pumarejo Bridge, Barranquilla/Atlántico, Colombia CB 240 Climbing Platforms, together with TRIO Wall Formwork, formed safe and accurate crane-climbed units for forming the pylons. In the area of the pier heads, VARIOKIT Truss Girders served as a reliable supporting construction for the working platform.](https://cdn.peri.cloud/.imaging/mWide/dam/faf81cf3-84b1-4bc9-b633-a935bdcedeb7/73218/new-pumarejo-bridge-barranquilla-atl%C3%A1ntico-colombia.jpg)
Record-breaking bridge successfully completed with PERI systems
The new cable-stayed bridge over the Rio Magdalena is 2.3 km long. PERI engineers supported the challenging construction project by providing a customised formwork and scaffolding solution that has been designed for realising the simultaneous construction of the pylons, bridge piers along with the superstructure. The versatility of the formwork and scaffolding systems as well as the combination possibility with the VARIOKIT Engineering Construction Kit facilitated shortened assembly times also when dealing with complex geometries.
09
Nov
![Concrete House, Sussex, United Kingdom Normally, DUO would be used to form smaller regular shaped structures as an efficient alternative to heavier systems. However, this project proved that the DUO system is capable of more.
(Photo: seanpollock.com)](https://cdn.peri.cloud/.imaging/mWide/dam/8d013fe5-613f-41c4-9441-b600894a22c5/32809/concrete-house-sussex-united-kingdom.jpg)
![Concrete House, Sussex, United Kingdom From the onset, the idea was to use DUO panels for horizontal and vertical applications to form slabs, columns and walls. The lightweight panels, the largest weighing no more than 25 kg, were ideal for the project due to its location and confined site space.
(Photo: seanpollock.com)](https://cdn.peri.cloud/.imaging/mWide/dam/7188c227-628d-46c9-bab6-a7b1ca985444/32816/concrete-house-sussex-united-kingdom.jpg)
![Concrete House, Sussex, United Kingdom Quite literally, the structure pushes the boundaries of a ‘simple square’, as it comprises irregular angles in addition to varying floor heights throughout.
(Photo: seanpollock.com)](https://cdn.peri.cloud/.imaging/mWide/dam/14718453-2746-427c-9e6a-b756d215ee09/32803/concrete-house-sussex-united-kingdom.jpg)
A bold concrete structure built entirely with DUO formwork
Over the past year, a concrete structure has slowly emerged amongst a more conventional residential setting in East Sussex. The single-storey structure is the first self-build project the owner, Adrian Corrigall, has ever built. At the same time, it’s also PERI’s first housing project with DUO in the United Kingdom.
30
Oct
![PERI Group acquires stake in COBOD International A/S In Copenhagen the so-called "BOD" ("Building on Demand") was printed with a 3D concrete printer from COBOD. This office building is the first 3D printed building in Europe.](https://cdn.peri.cloud/.imaging/mWide/dam/a28575c0-ccf4-43be-b33f-11314605b06e/32731/peri-group-acquires-stake-in-cobod-international-a-s.jpg)
![PERI Group acquires stake in COBOD International A/S New Impulses for 3D printing in the construction industry.](https://cdn.peri.cloud/.imaging/mWide/dam/51f1c64d-759c-4cde-bd36-e31c24599709/32729/peri-group-acquires-stake-in-cobod-international-a-s.jpg)
![PERI Group acquires stake in COBOD International A/S COBOD 3D printer](https://cdn.peri.cloud/.imaging/mWide/dam/9b982fc8-d532-488d-a352-520cd15a740f/32736/peri-group-acquires-stake-in-cobod-international-a-s.jpg)
PERI Group acquires stake in COBOD International A/S
The PERI Group, one of the world's leading companies in the field of formwork and scaffolding for the construction industry, acquires a stake in the Danish 3D concrete printing specialist COBOD International A/S based in Copenhagen.
02
Oct
![PERI UP Easy facade scaffolding system Residential and office building “Ypsilon“, Ulm](https://cdn.peri.cloud/.imaging/mWide/dam/dd3862fa-bae8-4f0c-9487-8cac808baf1d/33127/peri-up-easy-facade-scaffolding-system.jpg)
![Shell of the residential and office building Residential and office building “Ypsilon“, Ulm](https://cdn.peri.cloud/.imaging/mWide/dam/2f863a14-c490-4a0f-9194-7507a4dc0e9f/33126/shell-of-the-residential-and-office-building.jpg)
![On-schedule performance of the construction work Residential and office building “Ypsilon“, Ulm](https://cdn.peri.cloud/.imaging/mWide/dam/c025686c-1a41-4f73-b2c9-9952ea63a045/33148/on-schedule-performance-of-the-construction-work.jpg)
Accident-free construction with PERI UP Easy
On the basis of the PERI UP Easy scaffold system, which was assembled in line with the actual construction progress, work operations could be carried out quickly and safely. In spite of the challenging building geometry and cramped jobsite conditions, completion took place within the planned budget and time-frame, and without any work-related accidents.
04
Sep
![V&A Museum, Dundee, United Kingdom After months of planning and construction, Kuma’s vision is now a tangible work of art that is set to open its doors to the public.](https://cdn.peri.cloud/.imaging/mWide/dam/334bac25-ce4e-449a-8293-b2d612830b01/32765/v-amp-a-museum-dundee-united-kingdom.jpg)
![V&A Museum, Dundee, United Kingdom The complex geometry of the panel face required the highest quality work from PERI fabrication teams in the UK and Germany. The panels consist of two layers of 4 mm plywood, 21 mm thick lathing timbers, Cleatbox interlocking chipboard rib grillage and VARIO base panel – SRU walers, GT 24 girder and 21 mm thick chipboard panel face.](https://cdn.peri.cloud/.imaging/mWide/dam/01ab71de-1cc3-4ca4-beee-407016f05190/32756/v-amp-a-museum-dundee-united-kingdom.jpg)
![V&A Museum, Dundee, United Kingdom Fabrication in action at Rugby.](https://cdn.peri.cloud/.imaging/mWide/dam/257a688f-8d8d-4339-8119-645828d70344/32759/v-amp-a-museum-dundee-united-kingdom.jpg)
Extraordinary formwork for an extraordinary building
Inspired by cliffs of sedimentary rock standing proud against the sea, at the centre of Dundee’s £1 billion waterfront regeneration, lies the V&A Museum of Design. This £80.11 million masterpiece, the first UK work penned by renowned Japanese architect Kengo Kuma, is a bold creation combining complex concrete architecture with glass facades and linear concrete cladding. PERI has provided professional engineering services and bespoke formwork solutions in order to achieve the best possible architectural concrete result.
01
Aug
![M-8 road bridge, Szczecinek by-pass, Poland For the M-8 road bridge, PERI engineers planned a project-specific shoring and formwork solution. The heavy-duty scaffold construction, consisting of VRB Heavy-Duty Truss Girders and VST Heavy-Duty Towers, safely transferred the high loads via long spans into the ground.](https://cdn.peri.cloud/.imaging/mWide/dam/6311132e-0835-467e-8459-ab6a8541cccd/33500/m-8-road-bridge-szczecinek-by-pass-poland.jpg)
![M-8 road bridge, Szczecinek by-pass, Poland For forming the superstructure comprised of bridge beams and carriageway slab, the planners combined VARIOKIT formwork units with VARIO GT 24 Girder Wall Formwork system components.](https://cdn.peri.cloud/.imaging/mWide/dam/5e396810-d320-4dac-9f15-ab30180c078e/33503/m-8-road-bridge-szczecinek-by-pass-poland.jpg)
![M-8 road bridge, Szczecinek by-pass, Poland The implementation plan featured two independent bridge superstructures with a pre-stressed, twin-webbed T-beam cross-section. The two superstructures were alternately concreted whereby the formwork and shoring were placed in an offset position from one bridge segment to the other.](https://cdn.peri.cloud/.imaging/mWide/dam/9274248d-9288-453e-94c1-f4cf0e64b8a3/33501/m-8-road-bridge-szczecinek-by-pass-poland.jpg)
Premiere for the VARIOKIT Heavy-Duty Truss Girder in Poland
For realising a demanding bridge construction in the wetland area near Szczecinek, PERI engineers planned a project-specific shoring and formwork solution. Heavy-Duty Truss Girders and Heavy-Duty Truss Towers based on the VARIOKIT Engineering Construction Kit safely transferred the high loads via large spans and into the ground; VARIOKIT formwork units along with the customised formwork solution were supported on this. The first use of the truss girders convinced the construction team due to the low weight and fast assembly. Factors that facilitated both time and cost savings during the execution.
02
Jul
![National Veterans Memorial and Museum, Columbus, Ohio, USA Constructing the asymmetric structure presented many challenges for the project’s concrete contractor, Baker Concrete, and formwork supplier, PERI USA.](https://cdn.peri.cloud/.imaging/mWide/dam/a32833ca-ddb1-47c8-a1b2-4559c692eab5/33533/national-veterans-memorial-and-museum-columbus-ohio-usa.jpg)
![National Veterans Memorial and Museum, Columbus, Ohio, USA More than 9,000 square meters of PERI’s VARIO system wall forms were required to place the National Veterans Memorial and Museum’s curved walls.](https://cdn.peri.cloud/.imaging/mWide/dam/18b052fb-3d1d-41db-88c3-e2bcd7d389e2/33523/national-veterans-memorial-and-museum-columbus-ohio-usa.jpg)
![National Veterans Memorial and Museum, Columbus, Ohio, USA Because the radius of the Memorial and Museum’s curving walls changes continuously, each form panel used on the project was unique.](https://cdn.peri.cloud/.imaging/mWide/dam/9e413bcb-49aa-48f5-af83-f0213c3c78c2/33521/national-veterans-memorial-and-museum-columbus-ohio-usa.jpg)
Custom formwork and box-outs precisely form sweeping curves of unique concrete structure
The National Veterans Memorial in Columbus, Ohio will open in the fall of 2018. The elegant, sweeping curves of the three interlaced cast-in-place reinforced concrete rings that define the structure belie the complexity of the project’s design and construction.
24
May
![In focus: PERI bundles BIM activities In 2017, PERI founded the Digital Transformation Office in order to systematically promote digitalization. With the integration of the BIM Competence Center in this area, the company is taking account of the increasing strategic importance of this topic.](https://cdn.peri.cloud/.imaging/mWide/dam/f4f783ab-e1b8-47a3-b01f-b015c1bdb61a/32738/in-focus-peri-bundles-bim-activities.jpg)
In focus: PERI bundles BIM activities
Weißenhorn. PERI, one of the world's largest manufacturers and suppliers of formwork and scaffolding systems, has been a pacesetter on the road to the future of digital construction for many years now. In 2017, the family‑owned company founded a Digital Transformation Office whereby all of PERI's digitalization‑related strategic activities and initiatives would be grouped together and coordinated. Furthermore, the PERI BIM Competence Center, which has existed since 2015, has also been integrated into the Digital Transformation Office.
02
May
![REDI Majakka Tower, Helsinki, Finland For constructing the 134 m high residential building, safety was a top priority. The PERI RCS P Climbing Protection Panel served as an enclosure as well as anti-fall protection. The gap-free enclosure of the skeleton structure´s floors protected the construction team also at great heights against strong winds and the weather.](https://cdn.peri.cloud/.imaging/mPortrait/dam/2a9efbb5-57c2-4f0b-92c6-e9e5e722f035/33414/redi-majakka-tower-helsinki-finland.jpg)
![REDI Majakka Tower, Helsinki, Finland Landing platforms consisting of standard system components served as temporary storage areas and for transferring loads to the following storeys. The platforms could be variably positioned anywhere on the building.](https://cdn.peri.cloud/.imaging/mWide/dam/4307763a-a90b-4991-b1ad-36aec5dbe9c9/33433/redi-majakka-tower-helsinki-finland.jpg)
![REDI Majakka Tower, Helsinki, Finland For cost-effective construction of the internal elevator shafts, MAXIMO external core formwork climbed with the RCS Rail Climbing System. Due to the rail-guided climbing procedure, the climbing units were reliably attached to the structure at all times which made climbing fast and safe also in windy conditions.](https://cdn.peri.cloud/.imaging/mWide/dam/4edff381-69be-49d7-890c-1f00e96f7756/33440/redi-majakka-tower-helsinki-finland.jpg)
Majakka reaches for the clouds – first residential tower in Finland
The tallest residential building in Finland – the 134 m high REDI Majakka Tower – is currently under construction in the old harbour district in the eastern part of Helsinki´s city centre, in the heart of Kalasatama. With the experience and competence resulting from countless projects worldwide in the area of climbing technology, PERI engineers have been supporting the construction team in the planning and efficient implementation of Finland's largest inner-city construction site.
10
Apr
![Terminal Building, Gazenica Passenger Port, Zadar, Croatia For the construction of the new terminal building in the port of Gazenica, the optimally coordinated PERI formwork and scaffolding solution facilitated fast and uninterrupted construction progress.](https://cdn.peri.cloud/.imaging/mWide/dam/ce47c018-bcbb-4691-96f9-cd1961640c67/32645/terminal-building-gazenica-passenger-port-zadar-croatia.jpg)
![Terminal Building, Gazenica Passenger Port, Zadar, Croatia Using PERI SRS Circular Column Formwork, V-shaped columns with diameters up to 100 cm could be realized. The first 6 m high concreting section was supported by SRU Steel Walers and Heavy-Duty Spindles taken from the VARIOKIT Engineering Construction Kit.](https://cdn.peri.cloud/.imaging/mWide/dam/5c635d47-a39d-4040-915f-09982caf9bd0/32668/terminal-building-gazenica-passenger-port-zadar-croatia.jpg)
![Terminal Building, Gazenica Passenger Port, Zadar, Croatia For concreting the second section of the 10.30 m high columns, a working platform was installed using PERI UP Flex Shoring which could be flexibly adapted in the 25 cm system grid to accommodate the diagonally-positioned circular columns.](https://cdn.peri.cloud/.imaging/mWide/dam/36f18036-c5e9-4e78-a4ef-5c90c5254647/32671/terminal-building-gazenica-passenger-port-zadar-croatia.jpg)
Fast construction progress thanks to a safe and coordinated scaffolding and formwork solution
For the construction of the new terminal building in the port of Gazenica, PERI Croatia planned and supplied a comprehensive formwork and scaffolding solution from a single source. The systems used were perfectly matched to one other and greatly contributed to ensuring safe and time-saving execution through efficient work procedures. The stringent demands in terms of occupational safety and surface quality could be met in spite of the complex building geometry and the need for large supporting heights.
01
Mar
![Hexagon Office Building, Calgary, Canada By combining CB Climbing Units with the MAXIMO Panel Formwork, the required high quality of the concrete surfaces was achieved while, at the same time, maintaining the tight construction schedule.](https://cdn.peri.cloud/.imaging/mWide/dam/90da344d-1e62-4e36-bb03-637df04199d8/33461/hexagon-office-building-calgary-canada.jpg)
![Hexagon Office Building, Calgary, Canada For the shafts, 90° MXSE Shaft Corners with MAXIMO elements formed a complete formwork unit which could be quickly moved with a single crane lift.](https://cdn.peri.cloud/.imaging/mWide/dam/ba84ea2c-0819-4ec1-841c-558c550e88ec/33420/hexagon-office-building-calgary-canada.jpg)
![Hexagon Office Building, Calgary, Canada Once struck, a clearance of 35 mm is created on each side of the shaft so that the entire internal shaft formwork can be moved to the next level.](https://cdn.peri.cloud/.imaging/mWide/dam/ea6f9236-3dd9-4900-b364-560a2cfbf4cc/33424/hexagon-office-building-calgary-canada.jpg)
Fast striking and easy climbing with the MAXIMO Shaft Corner
For realization of the Hexagon Headquarters in Calgary, reducing labour costs and execution times as well as minimizing the usage of the cranes for faster forming operations, was the main focus of attention for the construction company. By combining MAXIMO Panel Formwork with CB Climbing Units, not only could the required, high-quality concrete surfaces be achieved along with maintaining the tight schedule, but also ensured high safety and productivity levels of site personnel.
01
Feb
![Bee'ah Headquarters, Sharjah, United Arab Emirates The new headquarters of the environmental company Bee'ah is currently being realized according to the plans of the famous architect Zaha Hadid. The design of the futuristic building with its complex structure is based on the shape of a sand dune. (Source: www.zaha-hadid.com)](https://cdn.peri.cloud/.imaging/mWide/dam/83959d9f-7b2e-4523-92d5-e5a343101e70/33444/bee-ah-headquarters-sharjah-united-arab-emirates.jpg)
![Bee'ah Headquarters, Sharjah, United Arab Emirates At the centre of the design concept is the 23 m long and 17 m wide dome above the entrance hall. The PERI UP Modular Scaffolding forms the supporting structure of the dome formwork.](https://cdn.peri.cloud/.imaging/mWide/dam/52bb7c5b-31a8-45d1-970d-98154c0eb062/33447/bee-ah-headquarters-sharjah-united-arab-emirates.jpg)
![Bee'ah Headquarters, Sharjah, United Arab Emirates The formwork elements for the dome were individually planned and pre-assembled. On site, the individual segments are quickly and efficiently installed.](https://cdn.peri.cloud/.imaging/mWide/dam/d9fab3fc-deb0-4008-84f8-16d3361f3021/33446/bee-ah-headquarters-sharjah-united-arab-emirates.jpg)
Zaha Hadid's dunes for the desert in UAE’s eastern district
In the middle of the Sharjah Desert in the United Arab Emirates, a futuristic building is currently being constructed according to the plans of Zaha Hadid. As inspiration, the famous architect used nothing more than sand dunes. PERI is supporting this ambitious project with an individually-designed planning solution, project-specific formwork elements as well as by providing comprehensive support through its local team of experts.
19
Jan
![Family business sets course for further growth Official groundbreaking ceremony for the next expansion phase of the PERI scaffolding plant in Guenzburg, Bavaria (f. l. t. r.): MDL Dr. Hans Reichart (Member of the federal state parliament), Dr. Fabian Kracht (Managing Director Finance and Organisation), Leonhard Braig (Managing Director Product and Technology), Dr. Rudolf Huber (Chief Executive Officer), Gerhard Jauernig (Lord Mayor Guenzburg), MDL Alfred Sauter (Member of the federal state parliament), Alexander Schwörer (Managing Director Sales), Stephan Finkel (Managing Director Plant Guenzburg).](https://cdn.peri.cloud/.imaging/mWide/dam/767a2ff7-ff81-43b0-b696-305e473379b1/32696/family-business-sets-course-for-further-growth.jpg)
Groundbreaking ceremony for the next expansion phase of the PERI plant in Guenzburg
PERI GmbH sets course for further growth. The family-owned company, one of the world's largest manufacturers and suppliers of formwork and scaffolding systems, is massively increasing its production capacities. Today, the official groundbreaking ceremony for the next expansion phase of the scaffolding plant in Guenzburg, Bavaria, took place.
08
Jan
![Moselle Lock, Trier, Germany Formwork, scaffolding, engineering: PERI supported site operations with a project-specific formwork and scaffolding concept.](https://cdn.peri.cloud/.imaging/mWide/dam/ad2604eb-5b36-4a98-a064-5f4ce4b8ddd3/32687/moselle-lock-trier-germany.jpg)
![Moselle Lock, Trier, Germany From intake to outlet structure, the new, second lock has a total length of 312 m.](https://cdn.peri.cloud/.imaging/mWide/dam/cdac8359-e472-43a9-9930-d6597160be22/32686/moselle-lock-trier-germany.jpg)
![Moselle Lock, Trier, Germany For realizing the Moselle Lock in Trier, around 45,000 m³ of concrete was processed during the construction period of almost 1.5 years.](https://cdn.peri.cloud/.imaging/mWide/dam/b9c3331a-a68e-4807-960f-b364802c2105/32673/moselle-lock-trier-germany.jpg)
Project-specific formwork solution with high level of prefabrication
The realization of the new, second Moselle lock presented a challenging construction project for all those involved in the undertaking whereby numerous mounting components and strict tolerance specifications had to be taken into consideration. Working in close cooperation, PERI supported the construction site managers from Hochtief Infrastructure GmbH with a project-specific formwork and scaffolding concept, just-in-time deliveries of accurately pre-fabricated formwork elements as well as continuous on-site support.
12
Dec
![Expert jury determines the winners of the 11th PERI student competition The winner of the 11th Construction Exercise: Maxim Rotzalski from RWTH Aachen.](https://cdn.peri.cloud/.imaging/mWide/dam/3d6f4c5d-c134-4fbc-adeb-8acece39addd/32850/expert-jury-determines-the-winners-of-the-11th-peri-student-competition.jpg)
![Expert jury determines the winners of the 11th PERI student competition All participants of the final round of the 11th PERI Construction Exercise along with their supervisors as well as the PERI organization team together in the PERI GmbH exhibition hall in Weissenhorn.](https://cdn.peri.cloud/.imaging/mWide/dam/4208a46e-bdea-454f-a3c4-e6e751f5a9a9/32856/expert-jury-determines-the-winners-of-the-11th-peri-student-competition.jpg)
Expert jury determines the winners of the 11th PERI student competition
PERI offers all educational and training institutions involved in the field of construction the opportunity to participate in its well-known Construction Exercise, which not only provides valuable experience with specific practical application but also the chance to win attractive cash prizes.
04
Dec
![Williams Bridge, Rotterdam, Netherlands The refurbished Williams Bridge is an important road link between the northern and southern districts of Rotterdam. Its unrestricted and safe use was also to be ensured during the scaffolding operations and renovation work.](https://cdn.peri.cloud/.imaging/mWide/dam/c53c6ea8-3379-4503-80e6-fa6a0d81bffa/33617/williams-bridge-rotterdam-netherlands.jpg)
PERI system combination for challenging pylon scaffolding
The refurbishment of the pylons on Rotterdam's Williams Bridge proved to be a tremendous challenge for installing the scaffolding. The project-specifically designed PERI scaffold solution was based on two systems that could be combined with each other almost seamlessly: PERI UP and VARIOKIT.
01
Dec
![Dr. Rudolf Huber Dr. Rudolf Huber](https://cdn.peri.cloud/.imaging/mWide/dam/3baf19da-0794-4675-a3b5-e05625ecfe43/32859/dr-rudolf-huber.jpg)
Changes in the Advisory Board and in the Group Management of the PERI Group
The shareholders and the Advisory Board of the PERI Group have decided to change the management organization of the family-owned company: As of January 1, 2018, the Group Management of three managing directors, will be extended by a Chief Executive Officer (CEO) and thus, from this date on, will consist of four persons.
23
Nov
![The PERI UP Modular Scaffolding Kit The PERI UP Modular Scaffolding Kit has been designed in such a way to ensure that a very wide range of applications can be achieved with just a few different system components. This guarantees an increase in cost-effectiveness along with a range of other benefits for users.](https://cdn.peri.cloud/.imaging/mWide/dam/bb6d0f28-30f5-4402-996d-2fe8efd4c5ce/32884/the-peri-up-modular-scaffolding-kit.jpg)
![The PERI UP Modular Scaffolding Kit The PERI UP Modular Scaffolding Kit has been designed in such a way to ensure that a very wide range of applications can be achieved with just a few different system components. This guarantees an increase in cost-effectiveness along with a range of other benefits for users.](https://cdn.peri.cloud/.imaging/mWide/dam/3263beb0-bcb9-4e25-8d25-1508d1b94cb3/32887/the-peri-up-modular-scaffolding-kit.jpg)
![The PERI UP Modular Scaffolding Kit PERI UP Easy is one of the lightest steel facade scaffolds on the market. In addition, it provides a very high level of safety in the system as the guardrail for the next level is mounted with the Easy frame without requiring any additional components from the lower scaffolding level. The compatibility with components of the modular scaffolding ensures innovative, efficient solutions.](https://cdn.peri.cloud/.imaging/mWide/dam/1478fe5a-8372-416d-97c7-fe7b6b696833/32886/the-peri-up-modular-scaffolding-kit.jpg)
The PERI UP Modular Scaffolding Kit – more system in scaffolding operations
Safety requirements on construction sites are steadily increasing, scaffolding projects are becoming more and more complex and the cost pressures companies are facing is high. As a result, this not only changes the day-to-day challenges for the contractors but also the demands placed on the scaffold systems themselves. The question therefore arises whether a rigid differentiation of frame and modular scaffolding is still relevant today. After all, the market demands a product that contains both frame and modular scaffolding features as well as having the right solution in the system ready for every task. The PERI UP Modular Scaffolding Kit fulfills this requirement in every respect.
02
Nov
![Marieholm Tunnel, Gothenburg, Sweden For the twin-tube tunnel segments, the construction team forms and concretes the bottom slab and walls in a single pour, then the slabs using two VARIOKIT Formwork Carriages. Among other things, the limited work space in the dry dock poses a number of challenges.](https://cdn.peri.cloud/.imaging/mWide/dam/2cceb828-fb5a-40ed-af8f-121037077472/33664/marieholm-tunnel-gothenburg-sweden.jpg)
![Marieholm Tunnel, Gothenburg, Sweden The slab formwork carriages used are very modular in their design; the great flexibility of the VARIOKIT standard components facilitate simple adjustments to suit project-specific conditions. The relatively low weight of the VARIOKIT solutions is an additional benefit of the Engineering Construction Kit.](https://cdn.peri.cloud/.imaging/mWide/dam/68f503b3-12c6-4148-8901-a96e7cde09aa/33651/marieholm-tunnel-gothenburg-sweden.jpg)
![Marieholm Tunnel, Gothenburg, Sweden As far as possible, the PERI planning includes the use of standard system components. For the special shape of the arch, the team developes a project-specific formwork solution.](https://cdn.peri.cloud/.imaging/mWide/dam/44c940e2-6e18-4db7-8a57-815397e30608/33649/marieholm-tunnel-gothenburg-sweden.jpg)
Underwater tunnel connects the banks of the Göta älv river
One of the most interesting tunnels in Scandinavia, the Marieholm Tunnel, is currently being realized in the city of Gothenburg. In future, the 306 m long underground connection will ensure that the river Göta älv can be quickly crossed using the available six vehicle lanes. The structure is being constructed in the form of an immersed tunnel: three tunnel sections, each measuring more than 100 m long, are being produced in a dry dock with the help of a PERI VARIOKIT Tunnel Formwork Carriage and will subsequently be submerged in a trench excavated on the riverbed.
05
Oct
![PERI Library+ PERI has provided the product catalogues for the MAXIMO and SKYDECK formwork systems for direct integration in Autodesk® Revit®. A major help for all designers who want to visualise the later concrete finish during the initial modelling, for example.](https://cdn.peri.cloud/.imaging/mWide/dam/1df388fd-d02d-459c-b655-b1601da7d282/32870/peri-library.jpg)
Planning PERI formwork systems in Autodesk® Revit®
Autodesk® Revit® software for Building Information Modelling (BIM) includes functions for architectural planning and design, building technology, structural engineering and construction. Interested users can now integrate the PERI product catalogues for formwork systems MAXIMO and SKYDECK in Revit® and plan in the software using PERI system components.
28
Sep
![Four Seasons Hotel, Kuala Lumpur, Malaysia When finished, the 77-storey high-rise building will have a total height of 324.50 m.](https://cdn.peri.cloud/.imaging/mWide/dam/cbd2bc09-2fb9-4daf-a822-2804dc732577/33646/four-seasons-hotel-kuala-lumpur-malaysia.jpg)
![Four Seasons Hotel, Kuala Lumpur, Malaysia Located right next to the striking Petronas Towers is another architectural highlight in Kuala Lumpur: the Four Seasons Centre.](https://cdn.peri.cloud/.imaging/mPortrait/dam/e03558df-0cb3-4902-b636-ae6b7dda4060/33636/four-seasons-hotel-kuala-lumpur-malaysia.jpg)
![Four Seasons Hotel, Kuala Lumpur, Malaysia The RCS Climbing Protection Panel used provided a continuous, circumferential enclosure of the upper storeys under construction. An important requirement of the construction work, which demanded a high level of safety for the construction team, was thus fulfilled.](https://cdn.peri.cloud/.imaging/mWide/dam/b3d7774b-5469-4b40-8ae8-5da2c1c8a036/33634/four-seasons-hotel-kuala-lumpur-malaysia.jpg)
Luxury hotel construction ahead of schedule thanks to comprehensive PERI support
Situated in the shadow of the famous Petronas Towers, one of the most luxurious hotels in the world is currently being realized. For the building complex – the so-called Four Seasons Place – the PERI engineers developed an efficient scaffolding and climbing formwork solution. The most important goal was to facilitate efficient work operations and, at the same time, provide a high degree of safety for the personnel on site. Result: construction process is far ahead of the original planned schedule.
27
Sep
![Official opening of scaffold production in Günzburg / Bavaria Official opening of scaffold production in Günzburg / Bavaria](https://cdn.peri.cloud/.imaging/mWide/dam/86f5d66d-65f5-46c7-8cbc-34e639a42f96/32788/official-opening-of-scaffold-production-in-g%C3%BCnzburg-bavaria.jpg)
![Official opening of scaffold production in Günzburg / Bavaria Official opening of scaffold production in Günzburg / Bavaria](https://cdn.peri.cloud/.imaging/mWide/dam/58e036d0-e6f8-40e5-958f-0e7927f24209/32786/official-opening-of-scaffold-production-in-g%C3%BCnzburg-bavaria.jpg)
![Official opening of scaffold production in Günzburg / Bavaria Official opening of scaffold production in Günzburg / Bavaria](https://cdn.peri.cloud/.imaging/mWide/dam/cadacf9b-86af-4a5e-8fc8-1199bd566f93/32792/official-opening-of-scaffold-production-in-g%C3%BCnzburg-bavaria.jpg)
Official opening of scaffold production in Günzburg / Bavaria
Weissenhorn‑based PERI GmbH has planned further growth in its scaffolding division and to this end has created the required production capacities. As any expansion possibilities at the main plant in Weissenhorn are limited, a new manufacturing facility in the neighbouring town of Günzburg is beeing build since January 2016. The primary plant for the PERI UP scaffolding technology was officially opened on 22 September 2017.
04
Sep
![Demolition Syngenta High-Rise Building, Basel Demolition of the centrally located Syngenta high-rise building was hardly noticed in the immediate surroundings.](https://cdn.peri.cloud/.imaging/mWide/dam/901f58e1-4e32-4fbe-b363-89a63fe6e40e/33568/demolition-syngenta-high-rise-building-basel.jpg)
![Demolition Syngenta High-Rise Building, Basel Within the RCS Climbing Protection Panel, materials were carried off on each floor using small demolition excavators.](https://cdn.peri.cloud/.imaging/mWide/dam/4a0ed2c7-6eca-4457-88d3-822d2944c92f/33566/demolition-syngenta-high-rise-building-basel.jpg)
![Demolition Syngenta High-Rise Building, Basel Adapted to match the building floor plan, the enclosure ensured that all demolition work could always be safely carried out – for the benefit of the jobsite team and passers-by.](https://cdn.peri.cloud/.imaging/mWide/dam/3f7b51c3-7bbf-460f-b56d-957ad761c07b/33553/demolition-syngenta-high-rise-building-basel.jpg)
Virtually unnoticed: Demolition work on high-rise building within RCS enclosure
The Swiss agricultural company, Syngenta, is completely transforming its headquarters in the centre of Basel. For this, a 54 m high tower block had to be removed. Due to the position of the building which is directly adjacent to the corporate campus as well as in close proximity to the highly frequented Schwarzwaldallee and the Badischer Bahnhof, demolition using large demolition excavators was out of the question. PERI engineers in collaboration with contractor ERNE AG developed a concept on the basis of the RCS Rail Climbing System which allowed a safe and efficient dismantling of the structure within an all-round enclosure.
01
Sep
![MAXIMO panel formwork The innovative and tried-and-tested MAXIMO panel formwork has been adapted to accommodate the technology of single-sided anchoring and can be used very flexibly.](https://cdn.peri.cloud/.imaging/mWide/dam/dd952cee-d7b8-43ae-8b33-6f7b659df1df/32817/maximo-panel-formwork.jpg)
![Tie MX 15, MX 18 Depending on the fresh concrete pressure and wal thickness, the Tie MX 15 or MX 18 is used. In the process, a removable sealing allows fast and simple adaption to suit both sizes of anchor.](https://cdn.peri.cloud/.imaging/mWide/dam/f3543ec9-8be5-4ae6-800a-4468cab7e0d9/32824/tie-mx-15-mx-18.jpg)
![MXK bracket system The MXK bracket system provides a high level of safety whilst requiring only a minimum of installation effort. The lightweight system components can be installed on the ground by hand.](https://cdn.peri.cloud/.imaging/mWide/dam/a272bd0a-da29-44da-aec2-b35b3b053c24/32779/mxk-bracket-system.jpg)
A decade of maximum efficiency for forming walls
Presented for the first time at the bauma 2007, the MAXIMO panel formwork continues to make a convincing case even a decade later through its enormous economic efficiency. In particular, the tie technology that was developed ten years ago by PERI leads to significantly smaller numbers of jobsite personnel thus resulting in considerable time and cost savings. Over the years, PERI engineers have continually expanded the application areas of this innovation. This is why the PERI MAXIMO can be found on countless construction sites in Germany and around the world.
03
Aug
![Lakhta Center, St. Petersburg The future highest high-rise building in Europe is currently being realized in Saint Petersburg: the headquarters of the energy company Gazprom will reach a total height of 462 m. Spectacular multi-functional buildings, an amphitheater and spacious parks complement the complex.](https://cdn.peri.cloud/.imaging/mWide/dam/472ea26d-bc22-4268-aaa5-5c0628efc3dd/33546/lakhta-center-st-petersburg.jpg)
![Lakhta Center, St. Petersburg In particular, the spectacular location directly on the Finnish Jade Bight brought with it some special challenges. The foundations were complex not only because of the building´s height and high wind loads but also because of the existing ground conditions.](https://cdn.peri.cloud/.imaging/mWide/dam/c69d0070-dcd6-4c92-b892-8e45052f5692/33552/lakhta-center-st-petersburg.jpg)
![Lakhta Center, St. Petersburg For the spiral-shaped core of the high-rise structure, PERI planned and delivered an efficient formwork solution based on the ACS Self-Climbing System. Crane and weather-independent work operations accelerated the construction progress.](https://cdn.peri.cloud/.imaging/mWide/dam/d8083757-9a93-4213-bb64-e02b3e7ab3bf/33539/lakhta-center-st-petersburg.jpg)
Formwork and scaffolding from one source for the highest skyscraper in Europe
With its very impressive architecture, the Lakhta Center, a futuristic building complex designed by Tony Kettle, is the new highlight of Saint Petersburg. Eventually rising to a height of 462 m, the multi-storey building in the centre of the complex will not just surpass all other structures in Russia when it is completed. Rather, the high-rise building on the Finnish Jade Bight will be the tallest building in Europe. Faced with numerous formwork and scaffolding challenges, PERI has been providing the contractor with expert support throughout the project – from formwork solutions for the record-breaking foundations through to complex shoring arrangements.
01
Jul
![The highest possible architectural concrete quality PERI also planned and delivered the formwork solutions for the circumferential wave breakers as well as the multi-storey operation buildings on the artificial islands. The highest possible architectural concrete quality was the decisive requirement for the execution of the construction work.](https://cdn.peri.cloud/.imaging/mWide/dam/025de60d-c137-45fb-a15f-28a102e99e10/33576/the-highest-possible-architectural-concrete-quality.jpg)
![Planned and produced in Weissenhorn The cut-to-size plywood formlining for the project-specific formwork of the large-sized columns was planned and produced in Weissenhorn.](https://cdn.peri.cloud/.imaging/mWide/dam/8e7a44d3-c1c6-44ca-b00b-043e54b514e3/33595/planned-and-produced-in-weissenhorn.jpg)
![The PERI formwork The PERI formwork solution for the slabs, cantilevered balconies and parapets is largely based on standard components taken from various PERI systems. The Weissenhorn‑based company also planned, produced and delivered countless timber formers and other cut‑to‑size plywood panels for the circular‑shaped areas.](https://cdn.peri.cloud/.imaging/mWide/dam/9b485117-d992-4646-9eaa-57a8fc561952/33593/the-peri-formwork.jpg)
With PERI know-how and support for the best architectural concrete quality
Since 2010, PERI has been supporting the construction of the 6 km long underwater tunnel section of the fixed link between Hong Kong and Macao / Zhuhai with the provision of two forming machines. The excellent cooperation has led to additional orders: PERI has provided professional engineering services and project‑specific formwork solutions for achieving the best possible architectural concrete results as well as large time‑savings during construction work for the tunnel portals and two operation buildings.
18
Nov
![LGS Weather Protection Roof - Working on walkways PERI Weather Protection Roof - mounting a girder segment](https://cdn.peri.cloud/.imaging/mWide/dam/c2745a6a-676c-4f1b-8d44-8016747315fe/34000/lgs-weather-protection-roof-working-on-walkways.jpg)
![LGS Weather Protection Roof - Positioning elements with the crane PERI protection roof - Lifting of a girder segment with the crane](https://cdn.peri.cloud/.imaging/mWide/dam/53933c81-6ad3-454e-832b-a41eb3c619e0/33998/lgs-weather-protection-roof-positioning-elements-with-the-crane.jpg)
![LGS Weather Protection Roof - flexible for every work step The PERI protection roof opened for construction work with the concrete pump](https://cdn.peri.cloud/.imaging/mWide/dam/48619554-c815-4cae-a0a2-70925b3cd1ca/33988/lgs-weather-protection-roof-flexible-for-every-work-step.jpg)
Safe access to weather protection roof – no PPE against falling required
For the LGS Weather Protection Roof from the extensive PERI product portfolio, a fast and reliable solution for safe working on roof girders is now also available: a walkway along the girder whereby the use of personal protective equipment against falling is no longer required.
09
Nov
![Hotel Le Royal, Luxembourg - load platforms Scaffolding solution made with PERI VARIOKIT and PERI UP as well as MULTIPROP](https://cdn.peri.cloud/.imaging/mPortrait/dam/fc4e0414-1dbf-407f-b146-7cc30ab6b74e/74603/hotel-le-royal-luxembourg-load-platforms.jpg)
![Hotel Le Royal, Luxembourg - PERI UP trolley construction Platforms and Trolley planned by PERI and developed with VARIOKIT and PERI UP.](https://cdn.peri.cloud/.imaging/mPortrait/dam/f43c7136-b650-47b2-9f8e-12b97f524edd/74604/hotel-le-royal-luxembourg-peri-up-trolley-construction.jpg)
![Hotel Le Royal, Luxembourg - refurbishment of 165 rooms The system´s uniform 25 cm modular grid arrangement of the VARIOKIT and PERI UP made the implementation of the PERI solution easy.](https://cdn.peri.cloud/.imaging/mWide/dam/12a0b19c-6bf7-49db-9e7d-486d1fa066e5/74601/hotel-le-royal-luxembourg-refurbishment-of-165-rooms.jpg)
Cantilevered system combination for refurbishment measures
Cantilevered platforms have accelerated the complete renovation of a luxury hotel in Luxembourg. The customized project solution was based on two compatible PERI modular construction systems: VARIOKIT and PERI UP.
05
Oct
![Foz Tua Dam with 275 m dam crest Foz Tua Dam, Vila Real – Alijó, Portugal - PERI project](https://cdn.peri.cloud/.imaging/mWide/dam/93e1a276-0d28-4e72-ab33-f3e565845262/74656/foz-tua-dam-with-275-m-dam-crest.jpg)
![Foz Tua Dam with PERI UP Modular Scaffold solution Foz Tua Dam, Vila Real – Alijó, Portugal](https://cdn.peri.cloud/.imaging/mPortrait/dam/61725d4a-af24-4466-9778-06fc7fae2586/74653/foz-tua-dam-with-peri-up-modular-scaffold-solution.jpg)
![Foz Tua Dam and associated pumped-storage power station PERI project - water retaining structures - Foz Tua Dam, Vila Real – Alijó, Portugal](https://cdn.peri.cloud/.imaging/mWide/dam/45212ec5-13a8-4671-b3ea-a12c1d12f988/74654/foz-tua-dam-and-associated-pumped-storage-power-station.jpg)
Elaborate engineering services for an imposing dam
PERI devised and supplied an optimised and safe formwork and scaffolding solution for construction of the Foz Tua Dam and the associated pumped-storage power station. The PERI specialists supported the construction firm, Barragem de Foz Tua, ACE, to ensure the build was completed on schedule and with precision, providing an elaborate concept, as well as logistical and technical services.
01
Sep
![“Humboldt Forum“ City Palace, Berlin Overview of the construction site - PERI Project - "Humboldt Forum" City Palace, Berlin](https://cdn.peri.cloud/.imaging/mWide/dam/b90e0770-0b04-44bb-95b6-66dd0301ff23/74629/-humboldt-forum-city-palace-berlin.jpg)
![“Humboldt Forum“ City Palace, Berlin Facade view - PERI Project - "Humboldt Forum" City Palace, Berlin](https://cdn.peri.cloud/.imaging/mWide/dam/3507f7ce-df8d-4ba9-90fc-0ba97f58a2f4/74630/-humboldt-forum-city-palace-berlin.jpg)
![“Humboldt Forum“ City Palace, Berlin PERI formwork - PERI Project - "Humboldt Forum" City Palace, Berlin](https://cdn.peri.cloud/.imaging/mPortrait/dam/e4a2bea1-e117-43b5-b607-7f6cea0a823f/74651/-humboldt-forum-city-palace-berlin.jpg)
Formwork and scaffolding from one source for Berlin´s City Palace
For the reconstruction of Berlin´s City Palace, PERI supplied cost-effective formwork and scaffolding solutions from one source. In addition to providing large quantities of wall, column and slab formwork with fast shuttering and moving times as well as flexibly used scaffolding materials, the on-site support provided by the PERI engineers ensured that all requirements could be fulfilled along with maintaining the tight construction schedule.
11
Aug
![Importer of the year 2014 - PERI Ukraine Importer of the year 2014 - PERI Ukraine](https://cdn.peri.cloud/.imaging/mWide/dam/1d02456f-8d44-48e2-93fa-51ed57a77f77/34047/importer-of-the-year-2014-peri-ukraine.jpg)
![PERI Ukraine has been presented with two awards PERI Ukraine has been presented with two awards](https://cdn.peri.cloud/.imaging/mWide/dam/fd300f94-15b9-4f8d-8f34-f339e3b24a64/34048/peri-ukraine-has-been-presented-with-two-awards.jpg)
BEST SUPPLIER and IMPORTER OF THE YEAR Awards for PERI Ukraine
In recognition of its consistently high level of operational performance throughout 2014, PERI Ukraine has been presented with two awards: BEST SUPPLIER 2014 and IMPORTER OF THE YEAR 2014.
03
Aug
![Barangaroo South, Sydney - The three ITS high-rise towers Barangaroo South, Sydney - The three ITS high-rise towers for the centre of the ambitious Barangaroo South project in the Sydney harbour area.](https://cdn.peri.cloud/.imaging/mWide/dam/41540425-cccb-4757-903e-d0caf6fafce6/74628/barangaroo-south-sydney-the-three-its-high-rise-towers.jpg)
![Barangaroo South, Sydney - in the background the famous Sydney Opera House Barangaroo South, Sydney - With the Barangaroo Point Reserve (North), Central Barangaroo and Barangeroo South sub-projects, Sydney´s city centre is being expanded westwards by an impressive 22 hectares. In the foreground is the three ITS high-rise towers are rising steadily upwards; in the background is the famous Sydney Opera House with its distinctive roof structure.](https://cdn.peri.cloud/.imaging/mWide/dam/82787202-c548-4236-83a2-ae5b7232696a/74625/barangaroo-south-sydney-in-the-background-the-famous-sydney-opera-house.jpg)
![Barangaroo South, Sydney - Over 700 linaer metres of PERI LPS enclosure Barangaroo South, Sydney - Over 700 linaer metres of PERI LPS enclosure secure and accelerate construction work on the three high-rise towers - up to the final height of 217 m.](https://cdn.peri.cloud/.imaging/mWide/dam/0769f261-2ad5-439a-a327-ca377910d8b1/74626/barangaroo-south-sydney-over-700-linaer-metres-of-peri-lps-enclosure.jpg)
Construction time optimisation through comprehensive working safety and crane-independent climbing
The new LPS climbing protection panel from PERI provides comprehensive working safety and saves valuable crane time thanks to the mobile climbing hydraulics. This has accelerated construction progress on the International Towers Sydney complex on Australia's east coast.
14
Jul
![Expansion of the Panama Canal, Panama PERI Press Release: Completion now within reach: flooding of a canal section Expansion of the Panama Canal](https://cdn.peri.cloud/.imaging/mWide/dam/cb8c8162-6523-4baa-85ed-80531d42a42e/34021/expansion-of-the-panama-canal-panama.jpg)
Completion now within reach: flooding of a canal section
With the flooding of a canal section in June 2015, tests have begun in readiness for the scheduled opening of the expansion project in 10 months time. Since 2011, PERI has delivered around 1,100 containers of formwork and scaffolding materials to Panama. Once again, the company has demonstrated its superb service capabilities as well as ability to deliver – in this particular case through the excellent teamwork of several subsidiaries.
06
Jul
![Lascaux IV - Centre International d’Art Pariétal (CIAP) - overall view Lascaux IV - Centre International d’Art Pariétal (CIAP): Overall view of the museum complex. Through the TRIO panel formwork, the high requirements on the concrete surfaces have been fully met.](https://cdn.peri.cloud/.imaging/mWide/dam/a45df3df-da27-4e35-adb4-6b55ae576a09/74639/lascaux-iv-centre-international-d%E2%80%99art-pari%C3%A9tal-ciap-overall-view.jpg)
![Lascaux IV - Centre International d’Art Pariétal (CIAP) - TRIO panel formwork Lascaux IV - Centre International d’Art Pariétal (CIAP): The TRIO panel formwork allows the construction of the 13.50 m high walls with variable inclinations. Up to 14 m long RS push-pull props ensure the correct alignment of the elements.](https://cdn.peri.cloud/.imaging/mPortrait/dam/faa144cf-fd55-4b9f-b14b-78d17bd17528/74640/lascaux-iv-centre-international-d%E2%80%99art-pari%C3%A9tal-ciap-trio-panel-formwork.jpg)
![Lascaux IV - Centre International d’Art Pariétal (CIAP) - MXP platform system Lascaux IV - Centre International d’Art Pariétal (CIAP): The MXP platform system provides the maximum level of safety during anchor operations and when connecting the elements, and exactly matches the element widths of the TRIO.](https://cdn.peri.cloud/.imaging/mWide/dam/10e3143a-122f-47cb-b8bd-7d9d6d2c90ce/74637/lascaux-iv-centre-international-d%E2%80%99art-pari%C3%A9tal-ciap-mxp-platform-system.jpg)
Replica of a cave from the Paleolithic Age realised in the original form with PERI
The museum complex is dedicated to showcasing cave paintings with the central feature being a complete replica of the "Lascaux 4" cave. PERI has supported the project by providing an overall concept comprised of detailed technical preparation, absolute safe formwork solution and continuous consultation.
16
Jun
![Mercedes-Benz Museum in Stuttgart PERI press release - special formwork](https://cdn.peri.cloud/.imaging/mWide/dam/1a1ef934-7998-4bbc-8c18-4487f70b83c4/33334/mercedes-benz-museum-in-stuttgart.jpg)
![Mercedes-Benz Museum Stuttgart PERI press release - special formwork](https://cdn.peri.cloud/.imaging/mWide/dam/b27897bd-9d1f-48c8-95bf-b8a6ee700955/33292/mercedes-benz-museum-stuttgart.jpg)
![Absolute World Towers in Mississauga, Canada PERI press release - special formwork](https://cdn.peri.cloud/.imaging/mPortrait/dam/e5df1269-afa5-4844-843e-f0342646ebe4/33295/absolute-world-towers-in-mississauga-canada.jpg)
Formwork in every shape and dimension – even faster with the new CNC system
PERI is keeping pace with this trend: with individual formwork solutions, the formwork and scaffold expert ensures that complicated designs become reality. In order to increase the required capacity at the Weissenhorn formwork assembly plant, a second state-of-the-art CNC timber processing facility started operations in the spring of 2014.
16
Jun
![PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany PERI press release - PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany](https://cdn.peri.cloud/.imaging/mWide/dam/b07ae763-8213-474b-8a49-b1f82fac057e/34027/peri-accompanies-the-construction-sector-for-industry-4-0-integration-5d-conference-konstanz-germany.jpg)
![PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany PERI press release - PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany](https://cdn.peri.cloud/.imaging/mWide/dam/4e4a76be-c1a5-434d-aa9f-ea36013a95fa/34026/peri-accompanies-the-construction-sector-for-industry-4-0-integration-5d-conference-konstanz-germany.jpg)
![PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany PERI press release - PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany](https://cdn.peri.cloud/.imaging/mPortrait/dam/ad077419-9d6c-4926-b45d-492acb2fc632/34029/peri-accompanies-the-construction-sector-for-industry-4-0-integration-5d-conference-konstanz-germany.jpg)
PERI accompanies the construction sector for Industry 4.0 integration
PERI and other companies in the construction industry are becoming increasingly involved with the issue of "Building Information Modelling" (BIM), the all-embracing project planning in five dimensions. At the third 5D conference in Konstanz, Germany, the trend towards BIM was adopted and welcomed as the new standard.
01
Jun
![Viaduct Krakow-Płaszow Railway Junction - flexible and modular adaptability of the system Viaduct Krakow-Płaszow Railway Junction - Customized solution through the flexible and modular adaptability of the system.](https://cdn.peri.cloud/.imaging/mWide/dam/740da0f8-01d5-45de-a21e-d5f5b471f8df/75364/viaduct-krakow-p%C5%82aszow-railway-junction-flexible-and-modular-adaptability-of-the-system.jpg)
![Viaduct Krakow-Płaszow Railway Junction - safety guaranteed Viaduct Krakow-Płaszow Railway Junction - The safety was guaranteed through the compatibility with the PERI UP modular scaffolding.](https://cdn.peri.cloud/.imaging/mWide/dam/5006f384-3862-4521-b20c-1cce619b920b/75361/viaduct-krakow-p%C5%82aszow-railway-junction-safety-guaranteed.jpg)
![Viaduct Krakow-Płaszow Railway Junction - railway traffic undisturbed Viaduct Krakow-Płaszow Railway Junction - Heavy railway traffic at one of the busiest stations in Poland remained undisturbed during construction thanks to the PERI balanced cantilever equipment.](https://cdn.peri.cloud/.imaging/mWide/dam/f25a61ce-b6f9-4692-8fd7-e834af15b562/75362/viaduct-krakow-p%C5%82aszow-railway-junction-railway-traffic-undisturbed.jpg)
Cost-effective cable stay bridge construction with VARIOKIT balanced cantilever equipment
The current expansion of the Krakow metropolitan railway network (KST) requires, among other things, crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252 m long crossing was a prerequisite which meant the general contractor decided in favour of the cantilevered construction method for realizing the extradosed bridge with its hollow box cross-section.
05
May
![The PERI UP working scaffold Scaffold provides the solution for test preparations as well as continuous measurement and inspection work. Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.](https://cdn.peri.cloud/.imaging/mWide/dam/e8c902f7-5c71-4985-907c-434438c06a0c/75394/the-peri-up-working-scaffold-scaffold-provides-the-solution-for-test-preparations-as-well-as-continuous-measurement-and-inspection-work.jpg)
![The scaffolding solution was provided by PERI for the second endurance test likewise. PERI provided the scaffolding solution for the second endurance test.](https://cdn.peri.cloud/.imaging/mWide/dam/a227c06b-5b56-448a-aa55-0fbb0766b78b/75399/the-scaffolding-solution-was-provided-by-peri-for-the-second-endurance-test-likewise.jpg)
![PERI Up is the assembly-friendly scaffolding system Standard-to-standard connections as well as leg-to-standard connections of the PERI Up system allow flexibility.](https://cdn.peri.cloud/.imaging/mWide/dam/9531bb75-a49c-48a1-a608-8ad0d1745dee/75397/peri-up-is-the-assembly-friendly-scaffolding-system.jpg)
Modular, combinable, adaptable: Testing for Take-Off with PERI UP
As an essential prerequisite for the approval of the Airbus A350 XWB, the IABG Industrieanlagen-Betriebsgesellschaft mbH has carried out an extensive range of tests on the new wide-bodied aircraft at its testing facility in Erding. With the scaffolding solution from PERI, optimal adaptation of the working levels for the fuselage and wings was achieved.
16
Apr
![Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings PERI press release - Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings](https://cdn.peri.cloud/.imaging/mPortrait/dam/c54a77ab-d863-4d91-9a08-4c16402e0ca9/33924/competent-handling-of-renovation-work-with-project-specific-solutions-formwork-and-scaffolding-technology-for-existing-buildings.jpg)
![Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings PERI press release - Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings](https://cdn.peri.cloud/.imaging/mPortrait/dam/1f28b30c-807e-495b-b35d-c3eb11f928f8/33922/competent-handling-of-renovation-work-with-project-specific-solutions-formwork-and-scaffolding-technology-for-existing-buildings.jpg)
![Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings PERI press release - Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings](https://cdn.peri.cloud/.imaging/mPortrait/dam/20d6ec78-ff38-418c-b8c8-2083e2f33eef/33928/competent-handling-of-renovation-work-with-project-specific-solutions-formwork-and-scaffolding-technology-for-existing-buildings.jpg)
Competent handling of renovation work with project-specific solutions
Construction work on existing buildings frequently places high demands on clients, planners and building contractors. The entire planning procedure as well as the equipment to be used must be adapted to match the project-specific characteristics of the structure and, in particular, the constructional environment. With a wide range of products and their sophisticated use, PERI succeeds in finding the most suitable and cost-effective solution for each of the upcoming tasks.
01
Apr
![JKG Tower - RCS P climbing protection panel offers all-round anti-fall protection JKG Tower, Jalan Raja Laut, Kuala Lumpur - For the top 3 floors in each case, the RCS P climbing protection panel offers all-round anti-fall protection. In addition, it is used as advertising space.JKG Tower, Jalan Raja Laut, Kuala Lumpur](https://cdn.peri.cloud/.imaging/mWide/dam/362b7a70-4083-41d3-93a4-5f769253bc7e/75601/jkg-tower-rcs-p-climbing-protection-panel-offers-all-round-anti-fall-protection.jpg)
![JKG Tower - The RCS landing platform is integrated in the climbing formwork solution JKG Tower, Jalan Raja Laut, Kuala Lumpur - The RCS landing platform is integrated in the climbing formwork solution. Loads are temporarily stored on the landing platform as well as being moved from here into the other storeys.](https://cdn.peri.cloud/.imaging/mWide/dam/b02bf479-c20f-4a57-a113-ea53e43ce8d4/75602/jkg-tower-the-rcs-landing-platform-is-integrated-in-the-climbing-formwork-solution.jpg)
![JKG Tower - perforated steel sheeting used as enclosure of the PERI RCS P climbing protection panel JKG Tower, Jalan Raja Laut, Kuala Lumpur - The perforated steel sheeting used as enclosure of the PERI RCS P climbing protection panel is particularly suitable for use in warmer regions. It is air-permeable and prevents heat accumulation inside the building.](https://cdn.peri.cloud/.imaging/mPortrait/dam/f3432eee-a581-4c0b-8e1e-e869baac4933/75564/jkg-tower-perforated-steel-sheeting-used-as-enclosure-of-the-peri-rcs-p-climbing-protection-panel.jpg)
Working faster due to safer conditions
For the construction of the JKG Tower high-rise building complex – consisting of a 32-storey office tower along with a 13-storey parking facility – safety has been given the highest priority. As a result, the PERI formwork and shoring solution has also included, among other things, a corresponding training programme for the construction team.
25
Mar
![Leonhard Braig appointed Managing Director at PERI Leonhard Braig will be responsible for the areas of product management, product technology, development, procurement, production and logistics.](https://cdn.peri.cloud/.imaging/mWide/dam/e1f3977a-73ee-4033-b353-c612d857e8df/33930/leonhard-braig-appointed-managing-director-at-peri.jpg)
Leonhard Braig appointed Managing Director at PERI
Weissenhorn, 25 March 2015. Leonhard Braig (46) has been named Head of Products & Technology at PERI GmbH effective as of mid-April 2015. He will be responsible for the areas of product management, product technology, development, procurement, production and logistics.
03
Mar
![Metro extension, Algiers - Shuttering and stripping is done hydraulically on the VARIOKIT tunnel formwork carriage Metro extension, Algiers - Shuttering and stripping is done hydraulically on the VARIOKIT tunnel formwork carriage. It is also based on rentable system components and can be rapidly assembled and adapted by means of standardized bolted connections.](https://cdn.peri.cloud/.imaging/mWide/dam/3fd861b6-825f-4bc5-8b3a-6baed96c3b79/73825/metro-extension-algiers-shuttering-and-stripping-is-done-hydraulically-on-the-variokit-tunnel-formwork-carriage.jpg)
![Metro extension, Algiers - PERI UP working scaffold has been optimally adapted to suit the imposing cross-sectional geometry Metro extension, Algiers - The PERI UP working scaffold has been optimally adapted to suit the imposing cross-sectional geometry of the station´s arched form and is used to execute the waterproofing and reinforcement work in advance.](https://cdn.peri.cloud/.imaging/mWide/dam/d5017a11-4354-4cbc-848e-bf353a9b8734/73826/metro-extension-algiers-peri-up-working-scaffold-has-been-optimally-adapted-to-suit-the-imposing-cross-sectional-geometry.jpg)
![Metro extension - 144 m long and 23 m wide Metro extension, Algiers - The Algerian metro station "Place des Martyrs" is 144 m long and features record-breaking dimensions with its 23 m width and 14.80 m height.](https://cdn.peri.cloud/.imaging/mWide/dam/8958e776-d286-409b-aa35-4f52eb403d76/73831/metro-extension-144-m-long-and-23-m-wide.jpg)
Tunnel formwork with record-breaking dimensions
With a length of 144 m and a width approaching 23 m, the "Place de Martyrs" metro station boasts some very impressive dimensions. In addition, the entire 1.7 km long extension of the Algiers metro system runs under historic ground. For this project, an international team of PERI engineers designed economically optimized tunnel formwork solutions, tailored to meet the varying requirements.
03
Feb
![Pegasus Sculpture - more than 1,000 bronze castings could be assembled and welded on site Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.](https://cdn.peri.cloud/.imaging/mWide/dam/e5e15bfc-118b-45ff-b2ec-457d3128ed2b/73661/pegasus-sculpture-more-than-1-000-bronze-castings-could-be-assembled-and-welded-on-site.jpg)
![Pegasus Sculpture - PERI UP Rosett Flex modular scaffold system provided safe working conditions Pegasus Sculpture, USA - The PERI UP Rosett Flex modular scaffold system provided safe working conditions for the craftsmen and metal designers during the realisation of the 33 m high bronze work of art.](https://cdn.peri.cloud/.imaging/mWide/dam/c0134f4d-d54f-4b05-a36b-80bf59213a96/73661/pegasus-sculpture-peri-up-rosett-flex-modular-scaffold-system-provided-safe-working-conditions.jpg)
![Pegasus Sculpture - PERI UP provided optimum conditions for all necessary operational steps Pegasus Sculpture, USA - PERI UP was flexibly adapted to suit the organic shape of the bronze sculpture in 25 cm increments and thus provided optimum conditions for all necessary operational steps: adjustment, welding, processing, chasing and patinating.](https://cdn.peri.cloud/.imaging/mPortrait/dam/4b7ba60d-8815-48b3-a611-650a19a1c572/73662/pegasus-sculpture-peri-up-provided-optimum-conditions-for-all-necessary-operational-steps.jpg)
Super-sized bronze casting: 3D-puzzle on PERI UP scaffolding
For the erection of the extraordinary Pegasus bronze sculpture in Miami/Florida, PERI UP Rosett Flex provided optimal working conditions. The modular scaffold system proved once again just how flexible and versatile it is, adapting to the complex geometry in 25 cm increments.
20
Jan
![PERI India won the EPC World Media, Ernst & Young and Zee Business Group Award 2014 - Honoured for excellence in India Infrastructure and Construction Industry PERI press release - PERI India won the EPC World Media, Ernst & Young and Zee Business Group Award 2014 - Honoured for excellence in India Infrastructure and Construction Industry](https://cdn.peri.cloud/.imaging/mWide/dam/d22ad9bd-b6bc-4d4c-a70f-e10544d31240/33983/peri-india-won-the-epc-world-media-ernst-amp-young-and-zee-business-group-award-2014-honoured-for-excellence-in-india-infrastructure-and-construction-industry.jpg)
PERI India won the EPC World Media, Ernst & Young and Zee Business Group Award 2014
PERI India has been honoured with the EPC World, Ernst & Young and Zee Business Group Awards 2014 being an “Outstanding Company in Formwork and Scaffolding Sector”. The award was handed over on 18th of December 2014 in New Delhi.
01
Jan
![Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.](https://cdn.peri.cloud/.imaging/mWide/dam/3e1162fb-b8cc-4527-a8da-12fe74080f8f/73692/mausoleum-michni%C3%B3w-the-museum-shape-symbolizes-a-traditional-village-hut-which-gradually-crumbles-into-dust.jpg)
![Mausoleum Michniów - MULTIPROP towers and rentable VARIOKIT system components Mausoleum Michniów - MULTIPROP towers and rentable VARIOKIT system components form the up to 14.75 m high shoring.](https://cdn.peri.cloud/.imaging/mWide/dam/0db2d509-14b9-47b7-ae8c-797eae3b2f54/73692/mausoleum-michni%C3%B3w-multiprop-towers-and-rentable-variokit-system-components.jpg)
![Mausoleum Michniów - The tilting walls are formed using TRIO large sized elements Mausoleum Michniów - The tilting walls are formed using TRIO large sized elements – supported by diagonal bracing.](https://cdn.peri.cloud/.imaging/mWide/dam/2a571f01-9219-46be-bdbc-c3de346805f8/73689/mausoleum-michni%C3%B3w-the-tilting-walls-are-formed-using-trio-large-sized-elements.jpg)
Complex architecture primarily achieved with system formwork
In Poland, the mausoleum commemorating a mass murder of the entire village of Michniów and other Polish villages across the occupied country during the World War 2 is currently being constructed. The museum features a traditional village hut which gradually falls apart. Numerous offsets and inclined surfaces characterize the structure as well as the distinctive timber-like finish on concrete surfaces.
02
Dec
![Mur Bridge Frohnleiten - VARIOKIT heavy-duty truss Mur Bridge Frohnleiten - For the construction of the Mur Bridge near Frohnleiten, the new VARIOKIT heavy-duty truss from PERI has set new standards in shoring operations.](https://cdn.peri.cloud/.imaging/mWide/dam/49ca33a7-7575-4612-ad27-48799e9ba800/73829/mur-bridge-frohnleiten-variokit-heavy-duty-truss.jpg)
![Mur Bridge Frohnleiten - the truss arrangement and spacings can be flexibly determined Mur Bridge Frohnleiten - For transferring the heavy loads over the almost 40 m span, the truss arrangement and spacings can be flexibly determined using a metric grid configuration.](https://cdn.peri.cloud/.imaging/mPortrait/dam/478ef956-cbc9-44ba-a691-33c2809df862/73830/mur-bridge-frohnleiten-the-truss-arrangement-and-spacings-can-be-flexibly-determined.jpg)
![Mur Bridge Frohnleiten - VARIOKIT system components were pre-assembled Mur Bridge Frohnleiten - Modular shoring assembly: VARIOKIT system components were pre-assembled on the ground to form truss segments and placed into intermediate storage with the crane. Three such segments were subsequently coupled to create a 37 m long truss unit and lifted over the Mur by means of a mobile crane.](https://cdn.peri.cloud/.imaging/mPortrait/dam/4a77b920-955e-44d6-aa54-7de035af050c/73851/mur-bridge-frohnleiten-variokit-system-components-were-pre-assembled.jpg)
Large-spanned trusses with high load-bearing capacity and low deadweight
For construction of the Mur Bridge, the new PERI VARIOKIT lattice girder system is being used for the first time in Austria. This is characterized by its extremely high load-bearing capacity with a comparably low weight; in addition, the system components can be quickly installed and have a very flexible use.
10
Nov
![Full-face surface repair for PERI Pave production pallets PERI press release - PERI and PyraTec sign cooperation agreement](https://cdn.peri.cloud/.imaging/mWide/dam/19e5e6ba-e0c7-43ae-b193-d4745e6e8ff0/33401/full-face-surface-repair-for-peri-pave-production-pallets.jpg)
Full-face surface repair for PERI Pave production pallets
After successful tests had been carried out with PERI Pave recently, PERI decided to cooperate closely with PyraTec in future: as a result, the specialist company will now take on the sustainable renovation of PERI production pallets with immediate effect – whilst taking into account the high PERI quality standards.
04
Nov
![Museum of Tomorrow - PERI planned, produced and delivered over 3,500 customised special formwork elements Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.](https://cdn.peri.cloud/.imaging/mWide/dam/4496086e-2142-4a6a-be37-138edafbcd1b/73641/museum-of-tomorrow-peri-planned-produced-and-delivered-over-3-500-customised-special-formwork-elements.jpg)
![Museum of Tomorrow - designed by Santiago Calatrava Museum of Tomorrow, Rio de Janeiro - The "Museum of Tomorrow“ was designed by Santiago Calatrava and extends 300 m into the sea on a pier.](https://cdn.peri.cloud/.imaging/mWide/dam/935a532e-0de9-4bda-9d12-69d695df899c/73642/museum-of-tomorrow-designed-by-santiago-calatrava.jpg)
![Museum of Tomorrow - the customised elements are assembled on site to form a complete 3D formwork construction Museum of Tomorrow, Rio de Janeiro - Supported by PERI UP shoring and working scaffolds, as well as VARIOKIT raised formwork units, the customised elements are assembled on site to form a complete 3D formwork construction.](https://cdn.peri.cloud/.imaging/mWide/dam/3207b20b-e833-4113-a0fb-ee990f889548/73647/museum-of-tomorrow-the-customised-elements-are-assembled-on-site-to-form-a-complete-3d-formwork-construction.jpg)
Trend-setting forming
A customized PERI formwork and scaffolding solution with 3,500 project-specific special formwork elements ensured that the realization of an extraordinary museum was carried out within the specified time-frame and budget.
01
Oct
![3rd Bosphorus Bridge - has the highest concrete bridge piers in the world The 3rd Bosphorus Bridge has the highest concrete bridge piers in the world, and will eventually connect the European and Asian continents after its completion in 2015.](https://cdn.peri.cloud/.imaging/mWide/dam/6916087e-a5de-40d6-bb27-6858d436e923/75427/3rd-bosphorus-bridge-has-the-highest-concrete-bridge-piers-in-the-world.jpg)
![3rd Bosphorus Bridge - PERI ACS climbing formwork is easily adapted from cycle to cycle to match the tapered pier layouts 3rd Bosphorus Bridge, Istanbul, Turkey - The PERI ACS climbing formwork is easily adapted from cycle to cycle to match the tapered pier layouts.](https://cdn.peri.cloud/.imaging/mPortrait/dam/b52e7db3-4ad1-4df7-a5d4-78f5a6c03c67/75428/3rd-bosphorus-bridge-peri-acs-climbing-formwork-is-easily-adapted-from-cycle-to-cycle-to-match-the-tapered-pier-layouts.jpg)
![3rd Bosphorus Bridge - adapting the formwork to the changing dimensions and positioning of the steel mounting parts 3rd Bosphorus Bridge, Istanbul, Turkey - The complete solution from PERI meets the strict requirements regarding high flexibility and dimensional accuracy.](https://cdn.peri.cloud/.imaging/mWide/dam/d1c6aa44-ea98-42d9-b51f-5204d72a08e3/75428/3rd-bosphorus-bridge-adapting-the-formwork-to-the-changing-dimensions-and-positioning-of-the-steel-mounting-parts.jpg)
Highest concrete bridge pier in the world with PERI ACS self-climbing formwork
In the north of the Turkish metropolis, the third and largest bridge is currently being built across the Bosphorus. The suspension bridge is supported by two A-shaped pylons and reaches a height of around 330 m thus making it one of the highest in the world. The construction of the upper area of the two piers is being carried out in 21 concreting sections, each 4.60 m.
11
Sep
![PERI Apps make construction site operations easier - More digital solutions in formwork and scaffolding PERI press release - Apps and Tools](https://cdn.peri.cloud/.imaging/mWide/dam/087150aa-5a11-4052-ae19-be972bd3743b/33389/peri-apps-make-construction-site-operations-easier-more-digital-solutions-in-formwork-and-scaffolding.jpg)
PERI Apps make construction site operations easier
PERI has developed resp. updated three of its helpful apps for formwork and scaffolding: Formwork Load Calculator, MULTIFLEX Configurator and ST 100 Stacking Tower Configurator are now available on the website featuring an extensive range of benefits.
01
Sep
![UTEC University Campus - high architectural requirements and a tight construction schedule UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.](https://cdn.peri.cloud/.imaging/mWide/dam/5328f5e8-0c0e-4946-b06f-ee13c22b1032/73990/utec-university-campus-high-architectural-requirements-and-a-tight-construction-schedule.jpg)
![UTEC University Campus - the loads resulting from the parapets, beams and slabs are reliably transferred UTEC University Campus, Lima, Peru - The loads resulting from the parapets, beams and slabs are reliably transferred by means of PERI UP Rosett shoring, also over the distance of several storeys.](https://cdn.peri.cloud/.imaging/mWide/dam/68b54aad-b15e-4c77-af03-727cf4c15557/74011/utec-university-campus-the-loads-resulting-from-the-parapets-beams-and-slabs-are-reliably-transferred.jpg)
![UTEC University Campus - Flexible in three dimensions - the 25 cm modular grid of the PERI UP system UTEC University Campus, Lima, Peru - Flexible in three dimensions: the 25 cm modular grid of the PERI UP system allows optimum adaptability to suit the wide range of geometries and loads.](https://cdn.peri.cloud/.imaging/mWide/dam/8d794c97-ccb8-44e4-9746-2bb8f1291b56/74012/utec-university-campus-flexible-in-three-dimensions-the-25-cm-modular-grid-of-the-peri-up-system.jpg)
Grandstand-style campus realized in a short construction period
With the help of a customized PERI formwork and scaffolding solution, a new university campus is being constructed in the capital of the South American country of Peru – complete with high architectural requirements as well as having to maintain a short construction period.
01
Aug
![Warsaw Spire - office tower with a height of 220 m Warsaw Spire - With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.](https://cdn.peri.cloud/.imaging/mWide/dam/d000c136-afb0-4648-9905-98fb7c31f84a/74741/warsaw-spire-office-tower-with-a-height-of-220-m.jpg)
![Warsaw Spire - a weekly cycle for the floors Warsaw Spire - The optimally adapted PERI climbing formwork solution for the core of the building has ensured a weekly cycle for the floors. The shell enclosing the RCS climbing protection panel is completely enclosed and has provided safe working conditions at all heights and in all weathers for the construction of the shell.](https://cdn.peri.cloud/.imaging/mWide/dam/14de1ce3-cc56-4959-aa0b-aa24d82d2bcb/74742/warsaw-spire-a-weekly-cycle-for-the-floors.jpg)
![Warsaw Spire - high‑quality surfaces with VARIO GT 24 Warsaw Spire - With the customized VARIO GT 24 girder formwork, the construction team achieved the required, high‑quality surfaces of partly elliptical core walls.](https://cdn.peri.cloud/.imaging/mWide/dam/5fd56079-671e-4fe1-a773-cb54e993bbba/74827/warsaw-spire-high%E2%80%91quality-surfaces-with-vario-gt-24.jpg)
Quickly and safely to the top with optimally adapted climbing technology
In Warsaw, the Warsaw Spire office complex is currently being constructed. The 220 m high, waist‑like office tower complete with elliptical ground plan characterizes the appearance of the building ensemble; the tower is flanked by a 55 m high building on each side. PERI has planned and supplied the complete formwork and scaffolding solution for the complex.
01
Jul
![Capitol Hill Station - VARIOKIT formwork carriage ensured rapid concreting sequences Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.](https://cdn.peri.cloud/.imaging/mWide/dam/807026e5-75eb-45cd-86aa-99650a4366a8/75475/capitol-hill-station-variokit-formwork-carriage-ensured-rapid-concreting-sequences.jpg)
![Capitol Hill Station - hydraulically operated PERI formwork carriage solution Capitol Hill Station, Seattle, USA - PERI formwork carriage solution ensures savings on assembly time and expense.](https://cdn.peri.cloud/.imaging/mWide/dam/648c2527-f468-4bc2-b2fb-8cf4a2bb2b19/75476/capitol-hill-station-hydraulically-operated-peri-formwork-carriage-solution.jpg)
![Capitol Hill Station - PERI TRIO, VARIO GT 24, SB Brace Frame, MULTIFLEX, MULTIPROP and PERI UP in use Capitol Hill Station, Seattle, USA - PERI TRIO, VARIO GT 24, SB Brace Frame, MULTIFLEX, MULTIPROP and PERI UP formwork and scaffold systems supplemented the comprehensive project solution.](https://cdn.peri.cloud/.imaging/mWide/dam/3b9f1bd5-074f-40cc-8a2e-6bae7c0e8deb/75473/capitol-hill-station-peri-trio-vario-gt-24-sb-brace-frame-multiflex-multiprop-and-peri-up-in-use.jpg)
System-based project solution saves time and money
The formwork and scaffolding solution provided for the construction of the new subway station in Seattle was the result of competent engineering and a project-specific construction kit system. In addition to the widest possible use of rentable PERI system components, the optimized construction method in particular ensured significant time and cost savings.
30
Jun
![Family Business Career Day at PERI PERI press release - Family Business Career Day](https://cdn.peri.cloud/.imaging/mWide/dam/8d869c03-51ca-4046-a8bf-b739ad91d623/33305/family-business-career-day-at-peri.jpg)
![Family Business Career Day at PERI PERI press release - Family Business Career Day](https://cdn.peri.cloud/.imaging/mWide/dam/ea74777e-9b7f-4449-92e9-7c283ae94c9d/33311/family-business-career-day-at-peri.jpg)
![Family Business Career Day at PERI PERI press release - Family Business Career Day](https://cdn.peri.cloud/.imaging/mWide/dam/6065289e-7fb8-44fa-982f-8cae33714850/33310/family-business-career-day-at-peri.jpg)
Family businesses offer international career opportunities
By arranging the Family Business Career Day we want, therefore, to inform candidates about the opportunities in our company and especially about potential positions around the world.
03
Jun
![Stanari Thermal Power Station - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.](https://cdn.peri.cloud/.imaging/mWide/dam/0bee5937-ab20-48c5-ac60-aa85fe386817/74801/stanari-thermal-power-station-a-total-of-9-circular-piers-with-3-60-m-diameters-and-40-cm-wall-thicknesses-will-subsequently-carry-a-steel-platform-for-the-condenser.jpg)
![Stanari Thermal Power Station - The units, consisting of formwork and scaffolding, can be quickly moved by crane to the next concreting cycle Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - The circular‑shaped piers steadily extend upwards by means of the CB 240 climbing formwork and VARIO GT 24 formwork elements to a height of around 26 m. The units, consisting of formwork and scaffolding, can be quickly moved by crane to the next concreting cycle. The PERI UP Alu 64 stairs provide safe and secure access to the working areas.](https://cdn.peri.cloud/.imaging/mPortrait/dam/890852c6-7226-43c8-9b30-12f19b8f7278/74802/stanari-thermal-power-station-the-units-consisting-of-formwork-and-scaffolding-can-be-quickly-moved-by-crane-to-the-next-concreting-cycle.jpg)
![Stanari Thermal Power Station - PERI UP modular scaffolding forms the shoring for up to 5.30 m high slab in the turbine building Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - The PERI UP modular scaffolding forms the shoring for up to 5.30 m high slab in the turbine building. The legs are simply bundled together in areas of high load concentrations – the system can therefore be optimally adapted to suit the loads.](https://cdn.peri.cloud/.imaging/mPortrait/dam/bf94b9aa-b26b-459e-a7b7-daa6ca86cca7/74807/stanari-thermal-power-station-peri-up-modular-scaffolding-forms-the-shoring-for-up-to-5-30-m-high-slab-in-the-turbine-building.jpg)
Test of strength for PERI formwork and scaffolding
The Energy Financing Team (EFT) is currently constructing the Stanari coal powered power plant near Doboj. PERI supplies two of the building contractors involved with a customized formwork and scaffolding solution. In addition to the materials, it is the technical preparation done by PERI engineers that provides extremely helpful support thus ensuring efficient project execution.
05
May
![Munich Airport Satellite Terminal - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.](https://cdn.peri.cloud/.imaging/mWide/dam/2c53eb75-29c2-42d6-936a-ca0e120b7c50/73854/munich-airport-satellite-terminal-the-600-m-long-new-satellite-terminal-at-munich-airport-is-located-in-the-centre-of-the-airfield.jpg)
![Munich Airport Satellite Terminal - More than 4,500 MULTIPROP slab props carry the steel construction until it is able to support independently Munich Airport Satellite Terminal, Germany - More than 4,500 MULTIPROP slab props carry the steel construction until, together with the hardened concrete, it is able to support independently. The up to 6.25 m extendable props only weigh 35 kg and can easily be moved by hand.](https://cdn.peri.cloud/.imaging/mPortrait/dam/9396a016-3214-4064-b59e-74cd60c4da7d/73854/munich-airport-satellite-terminal-more-than-4-500-multiprop-slab-props-carry-the-steel-construction-until-it-is-able-to-support-independently.jpg)
![Munich Airport Satellite Terminal - The PERI solution for the huge construction site includes a comprehensive package of services Munich Airport Satellite Terminal, Germany - The PERI solution for the huge construction site includes a comprehensive package of services: the supply of large quantities of materials, flexible engineering, tailored logistical operations as well as on-site support through the PERI project manager. The complete package provides all parties involved with real added value – for the contractor as well as the scaffolders.](https://cdn.peri.cloud/.imaging/mWide/dam/2a79aa5d-2632-4616-9de0-b7716bd8ebc1/73843/munich-airport-satellite-terminal-the-peri-solution-for-the-huge-construction-site-includes-a-comprehensive-package-of-services.jpg)
Comprehensive range of services for construction and scaffolding companies
In order to be able to handle around 11 million additional passengers per year from 2015 onwards, Terminal 2 at Munich Airport is currently being expanded in the form of a satellite terminal. PERI has supplied a complete solution consisting of formwork, scaffolding and engineering – and convinced both the construction company and the scaffolding contractor with its safer and faster system technology as well as a customized package of services.
28
Apr
![Seal of approval: Recognizing an ecological manufacturer - PEFC und FSC certifications for plywood PERI press release - Seal of approval: Recognizing an ecological manufacturer - PEFC und FSC certifications for plywood](https://cdn.peri.cloud/.imaging/mWide/dam/dae3186a-96ff-42e6-a469-0ee245aff721/33339/seal-of-approval-recognizing-an-ecological-manufacturer-pefc-und-fsc-certifications-for-plywood.jpg)
![PEFC und FSC certifications for PERI plywood PERI press release - Certifications for PERI plywood](https://cdn.peri.cloud/.imaging/mWide/dam/7c33c370-5625-4b5f-bde2-db13e50546e8/33337/pefc-und-fsc-certifications-for-peri-plywood.jpg)
Seal of approval: Recognizing an ecological manufacturer
A positive example for ecological and sustainable developments is the formwork and scaffolding manufacturer PERI, whose material for its plywood sheets originates from sustainable forests. The forest areas where the raw materials come from are reforested after every harvest – this is verified through the PEFC and FSC certifications.
22
Apr
![Award for myPERI - certificate Certificate for the award as most innovative product in show](https://cdn.peri.cloud/.imaging/mPortrait/dam/67e3e4a7-5fee-40bc-b073-bc9fd14e6d44/33326/award-for-myperi-certificate.jpg)
![Award for myPERI myPERI offers an efficient information management system for PERI jobsites.](https://cdn.peri.cloud/.imaging/mWide/dam/c7bd8dc3-6d8c-4da5-9314-b7fc0c9830b1/33313/award-for-myperi.jpg)
World Wide Success: myPERI wins award in Great Britain
Keeping an eye on all information concerning formwork and scaffolding materials on construction sites around the clock – this is something that has been available in Germany since February 2012 with myPERI. After successfully completing a series of test runs, the English version has been integrated into the range of services offered by the PERI subsidiary, and promptly received the award for "Most Innovative Product in Show" at the UK CONCRETE Show.
03
Apr
![ISET Tower - PERI planned a comprehensive, crane-independent concept ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.](https://cdn.peri.cloud/.imaging/mPortrait/dam/7f581ee4-39df-4629-b3d3-95a4026b4b8a/75616/iset-tower-peri-planned-a-comprehensive-crane-independent-concept.jpg)
![ISET Tower - With the RCS rail climbing system safely from storey to storey ISET Tower, Yekaterinburg, Russia - With the RCS rail climbing system, the external formwork safely climbs the circular building core from storey to storey using a rail-guded procedure. Level +1 is completely enclosed which guarantees efficient formworking operations and reinforcement work.](https://cdn.peri.cloud/.imaging/mWide/dam/c879583f-59ba-44a8-aa58-f7c2b0f5c25d/75613/iset-tower-with-the-rcs-rail-climbing-system-safely-from-storey-to-storey.jpg)
![ISET Tower - combination consisting of the ACS G and P versions are used ISET Tower, Yekaterinburg, Russia - For the internal formwork of the circular-shaped core wall, a combination consisting of the ACS G and P versions are used – optimally adapted to suit the geometric conditions of the ISET Tower.](https://cdn.peri.cloud/.imaging/mWide/dam/6c5f20e2-846c-410d-91b1-7e1e8e462599/75614/iset-tower-combination-consisting-of-the-acs-g-and-p-versions-are-used.jpg)
Project-specific climbing solution with practical adaptation
A customized PERI climbing formwork solution has been supporting the rapid construction progress on the ISET Tower in Yekaterinburg. The formwork concept has taken into account the high wind loads as well as the variable number of elevator shafts with varying dimensions.
01
Apr
![Dr. Fabian Kracht Dr. Fabian Kracht is the managing director for Finance and Organization at PERI GmbH.](https://cdn.peri.cloud/.imaging/mPortrait/dam/de36d359-fe3c-4dc3-b0d6-909ae50d9f41/33323/dr-fabian-kracht.jpg)
Fabian Kracht new managing director at PERI
From April 1, 2014 on, Dr. Fabian Kracht (35) will be the new managing director for Finance and Organization at PERI GmbH, one of the global market leaders for formwork and scaffolding.
03
Mar
![Marchlehner Gallery - at a height of 1,800 m above sea level with VARIOKIT Marchlehner Gallery, Sölden, Austria - The VARIOKIT tunnel formwork solution accelerated construction of the 228 m long Marchlehner gallery situated at a height of 1,800 m above sea level. The competent planning process took into account al possible project requirements which ensured on-schedule completion before the onset of winter.](https://cdn.peri.cloud/.imaging/mWide/dam/1e6d7f48-9a90-497f-b2cc-d017ebdd81af/73876/marchlehner-gallery-at-a-height-of-1-800-m-above-sea-level-with-variokit.jpg)
![Marchlehner Gallery - problem-free alignment of the formwork carriage Marchlehner Gallery, Sölden, Austria - A transverse launching unit integrated in the lifting unit ensured problem-free alignment of the formwork carriage to match the changing radii.](https://cdn.peri.cloud/.imaging/mPortrait/dam/6f412188-8fcd-4902-b0ba-791633c0d0c7/73873/marchlehner-gallery-problem-free-alignment-of-the-formwork-carriage.jpg)
![Marchlehner Gallery - four formwork units were based on VARIOKIT system components Marchlehner Gallery, Sölden, Austria - The four formwork units for the valley-side 1.50 m cantilevered tunnel slab were likewise based on VARIOKIT system components and could easily be moved by crane using designated lifting points on the gallows construction.](https://cdn.peri.cloud/.imaging/mPortrait/dam/4b403300-f392-47bb-bc0a-1a8a26d65244/73874/marchlehner-gallery-four-formwork-units-were-based-on-variokit-system-components.jpg)
Customized tunnel formwork carriage allows both construction and utilization
A VARIOKIT tunnel formwork solution accelerated construction progress for the 228 m long Marchlehner gallery, situated at a height of 1,800 m above sea level. The competent planning took into account all possible project requirements which ensured on-schedule completion before the onset of winter.
05
Feb
![Midfield Terminal Building - Over 6,000 PD 8 slab tables are in continuous use Midfield Terminal Building, Abu Dhabi - Over 6,000 PD 8 slab tables are in continuous use which is the equivalent to an area of almost 10 football pitches.](https://cdn.peri.cloud/.imaging/mWide/dam/f511397a-3909-4305-a9d2-dd92687c9fc4/73836/midfield-terminal-building-over-6-000-pd-8-slab-tables-are-in-continuous-use.jpg)
![Midfield Terminal Building - Moveable PD 8 slab tables and MULTIFLEX girder slab formwork is used Midfield Terminal Building, Abu Dhabij - Moveable PD 8 slab tables form the load-bearing sub-structure along the beams; for the slabs, MULTIFLEX girder slab formwork is used.](https://cdn.peri.cloud/.imaging/mWide/dam/55d2ee4d-4b0c-47e4-84a8-4b376f119744/73836/midfield-terminal-building-moveable-pd-8-slab-tables-and-multiflex-girder-slab-formwork-is-used.jpg)
![Midfield Terminal Building - PD 8 is the proven shoring system for slab tables and accommodates high loads Midfield Terminal Building, Abu Dhabi - PD 8 is the proven shoring system for slab tables and accommodates high loads. With only two different frame heights, almost any required height can be realized.](https://cdn.peri.cloud/.imaging/mPortrait/dam/a71e4d9e-82d6-45f8-b90b-4fb950e91773/73834/midfield-terminal-building-pd-8-is-the-proven-shoring-system-for-slab-tables-and-accommodates-high-loads.jpg)
Over 6,000 slab tables in continuous use at the Midfield Terminal project
PERI has provided yet another convincing performance with the construction of the Midfield Terminal at Abu Dhabi International Airport with the delivery of enormous amounts of materials at short notice as well as competent engineering for the related formwork and scaffolding planning.
07
Jan
![Smithland Hydroelectric Power Plant is equipped with 3 turbines Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.](https://cdn.peri.cloud/.imaging/mWide/dam/399d2932-f379-441e-8c23-bec8559fef51/74005/smithland-hydroelectric-power-plant-is-equipped-with-3-turbines.jpg)
![Smithland Hydroelectric Power Plant - PERI planned and assembled multi-curved formwork units Smithland Hydroelectric Power Plant - For the construction of the concrete tubes, PERI planned and assembled multi-curved formwork units. The final assembly of the formwork and shoring construction is carried out on site.](https://cdn.peri.cloud/.imaging/mWide/dam/85a566c1-1ead-44e3-afb5-15a2aaac0524/74006/smithland-hydroelectric-power-plant-peri-planned-and-assembled-multi-curved-formwork-units.jpg)
![Smithland Hydroelectric Power Plant - The fully assembled units are lifted by crane Smithland Hydroelectric Power Plant - The fully assembled units comprising of formwork units and raised formwork are lifted by crane into the concreting position.](https://cdn.peri.cloud/.imaging/mWide/dam/5cdc1550-1085-480b-a0fa-2572ad01528c/73963/smithland-hydroelectric-power-plant-the-fully-assembled-units-are-lifted-by-crane.jpg)
From the planning to implementation – comprehensive engineering services for construction of the power plant shell
For the Smithland hydropower station, PERI provides a customized formwork and shoring solution. The extremely tight construction schedule, massive structural elements and in part multi-curved surfaces required a huge number of specially-made 3D formwork units in addition to large quantities of system equipment.
05
Dec
![MAXIMO MX tie With PERI MAXIMO, the latest edition on panel formwork contains for the first time a system with one-sided tie technology – which has been proven to save up to 50 % on workload.](https://cdn.peri.cloud/.imaging/mWide/dam/8eebb777-33cf-414b-8642-b21109d429ad/33217/maximo-mx-tie.jpg)
![New working time reference values for panel formwork PERI press release - Documented efficiency: shuttering times reduced by 50 % with Maximo - New working time reference values for panel formwork](https://cdn.peri.cloud/.imaging/mWide/dam/d7039157-fafc-44f7-b50b-db4f86041a56/33223/new-working-time-reference-values-for-panel-formwork.jpg)
![New working time reference values for panel formwork PERI - press release - New working time reference values for panel formwork](https://cdn.peri.cloud/.imaging/mWide/dam/0c525b22-3e4e-4e1f-bf2b-22fb0a23c633/33221/new-working-time-reference-values-for-panel-formwork.jpg)
Documented efficiency: shuttering times reduced by 50 % with Maximo
The reference times featured in the "Arbeitsorganisation Bau" handbook are a valuable basis for construction site calculations in Germany. With Maximo, the latest edition on panel formwork contains for the first time a system with one-sided tie technology – which has been proven to save up to 50 % on workload.
02
Dec
![Motorway bridge over the Drava - VARIOKIT cantilevered parapet Motorway bridge over the Drava, Osijek, Croatia - A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets.](https://cdn.peri.cloud/.imaging/mWide/dam/6fa66bd2-b08f-4b0c-8f1c-0c60c3e4aafd/75371/motorway-bridge-over-the-drava-variokit-cantilevered-parapet.jpg)
![Motorway bridge over the Drava - PERI steel formwork for best concrete surface results Motorway bridge over the Drava, Osijek, Croatia - The precast beams of the foreland bridges are supported on 180 cm thick circular columns complete with mushroom shaped heads.](https://cdn.peri.cloud/.imaging/mWide/dam/b5d94b19-efab-4ae7-bbac-f64d1c624553/75372/motorway-bridge-over-the-drava-peri-steel-formwork-for-best-concrete-surface-results.jpg)
![Motorway bridge over the Drava - construction consisting of VARIOKIT and PERI Up system components Motorway bridge over the Drava, Osijek, Croatia - The internal cantilevered parapets are formed by a movable solution of a construction of VARIOKIT and PERI Up system components.](https://cdn.peri.cloud/.imaging/mWide/dam/591a1d7c-2f17-4741-b817-cb2b1eb85918/75370/motorway-bridge-over-the-drava-construction-consisting-of-variokit-and-peri-up-system-components.jpg)
Formwork solution for pylons and bridge superstructure from one source
The bridge over the Drava river is part of the realization of the 90 km long A5 motorway development in eastern Croatia. Peri planned and delivered not only a cost-effective climbing formwork solution for the construction of the up to 75 m high bridge pylons, but also the concept for the creation of the piers and the parapet solution for the foreshore bridges.
25
Nov
![9th Construction Exercise group picture For the tenth time, Peri is offering all educational and training institutions involved in the field of construction the opportunity of participating in its well known Construction Exercise.](https://cdn.peri.cloud/.imaging/mWide/dam/eb734b7c-9334-4f38-aba3-58a8ce2b45c9/33272/9th-construction-exercise-group-picture.jpg)
![9th Construction Exercise winning team For the tenth time, Peri is offering all educational and training institutions involved in the field of construction the opportunity of participating in its well known Construction Exercise.](https://cdn.peri.cloud/.imaging/mWide/dam/72c1f78e-9b22-495d-84ce-8e1baf95c3eb/33270/9th-construction-exercise-winning-team.jpg)
International competition with high requirements and a long tradition
For the tenth time, Peri is offering all educational and training institutions involved in the field of construction the opportunity of participating in its well known Construction Exercise. The competition not only provides valuable experience with a specific practical application but also the chance to win attractive cash prizes. Winners of the 9th competition were recently awarded – and thoughts have already turned to the next competition.
04
Nov
![Eemshaven Power Plant - the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.](https://cdn.peri.cloud/.imaging/mWide/dam/538456ee-5484-40a6-9efe-4a4d1c98093f/74799/eemshaven-power-plant-the-industrial-scaffold-system-peri-up-has-clearly-demonstrated-its-flexibility-and-adaptability.jpg)
![Eemshaven Power Plant - PERI UP Rosett Flex modular scaffolding system Eemshaven Power Plant, Netherlands - Working platforms and integrated access means for the welding and insulation operations on the two electric filters for the flue gas desulphurisation are based on the PERI UP Rosett Flex modular scaffolding system.](https://cdn.peri.cloud/.imaging/mPortrait/dam/396b9f51-239d-4c67-8865-1b2ec50f800f/74800/eemshaven-power-plant-peri-up-rosett-flex-modular-scaffolding-system.jpg)
![Eemshaven Power Plant - spatial scaffolding of the filter funnel Eemshaven Power Plant, Netherlands - For the spatial scaffolding of the filter funnel, the metric grid system of the PERI UP scaffolding system which allows the bay widths to be divided as required is a particular advantage.](https://cdn.peri.cloud/.imaging/mWide/dam/112312a3-dea3-406f-aeca-bfbdeb8ea7f5/74797/eemshaven-power-plant-spatial-scaffolding-of-the-filter-funnel.jpg)
High level of working safety for scaffold assembly and use
As part of the planned construction of the new power plant, the Peri Up Rosett Flex has proved to be extremely adaptable during the assembly phase – in so doing, it has fulfilled the highest requirements regarding the installation of the working platforms. The fact that the modular scaffolding can be assembled with the guardrail in advance means that the safety level required during scaffold erection is already guaranteed to a high degree.
01
Oct
![Hotel Mélia, La Défense - 2,00 m high mesh barriers from the PROKIT safety system Hotel Mélia, La Défense, Paris, France - The 2,00 m high mesh barriers from the PROKIT safety system are also clad with sheeting thus creating a gap free enclosure.](https://cdn.peri.cloud/.imaging/mPortrait/dam/09870272-1ba8-4ff6-9e11-33003a8ec759/75588/hotel-m%C3%A9lia-la-d%C3%A9fense-2-00-m-high-mesh-barriers-from-the-prokit-safety-system.jpg)
![Hotel Mélia, La Défense - climbing rails Hotel Mélia, La Défense, Paris, France - The climbing rails are held in position on the parapets of the basement levels and additionally fixed to the slab.](https://cdn.peri.cloud/.imaging/mPortrait/dam/6eabc80e-d339-494b-837f-544519efd86f/75585/hotel-m%C3%A9lia-la-d%C3%A9fense-climbing-rails.jpg)
![Hotel Mélia, La Défense - The PERI solution also includes a landing platform Hotel Mélia, La Défense, Paris, France - The PERI solution also includes a landing platform that provides fast and safe transport of materials up to the next storeys.](https://cdn.peri.cloud/.imaging/mPortrait/dam/4be9dcb0-7469-4fa9-a97f-1e832d50007d/75586/hotel-m%C3%A9lia-la-d%C3%A9fense-the-peri-solution-also-includes-a-landing-platform.jpg)
Made-to-measure climbing formwork solution – all-round enclosure and formwork scaffold
For the Hotel Mélia in the "La Defense" office district just outside Paris, Peri has developed a climbing formwork solution that not only provides complete enclosure of the structure but also serves as erection support for the precast parapets.
13
Sep
Group Management at PERI will be extended
PERI, global market leader for formwork and scaffolding with a turnover of 1.052 billion Euros in 2012 and 6,600 employees worldwide, is going to extend its Group Management.
02
Sep
![Lanaye Lock Bridge - the concentrated loads are transferred into the available bridge piers Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.](https://cdn.peri.cloud/.imaging/mWide/dam/35ed80d7-897c-442a-955d-c2603523895f/73858/lanaye-lock-bridge-the-concentrated-loads-are-transferred-into-the-available-bridge-piers.jpg)
![Lanaye Lock Bridge - new construction of a 200 m long road bridge required Lanaye Lock Bridge, Belgium - The expansion of the Lanaye lock facility required the new construction of a 200 m long road bridge.](https://cdn.peri.cloud/.imaging/mWide/dam/c235f641-65ed-4d4c-9815-def9d0fc80a3/73863/lanaye-lock-bridge-new-construction-of-a-200-m-long-road-bridge-required.jpg)
![Lanaye Lock Bridge - VARIOKIT steel composite formwork carriage Lanaye Lock Bridge, Belgium - The VARIOKIT steel composite formwork carriage could be adapted to match the geometrical and static requirements which included 4.50 m cantilevers.](https://cdn.peri.cloud/.imaging/mWide/dam/e25bdf52-2ea5-435c-a177-0e4ea00f7d38/73864/lanaye-lock-bridge-variokit-steel-composite-formwork-carriage.jpg)
Individual project solution with construction kit system
The Variokit modular construction system is being used for the cost-effective realization of the steel composite bridge over the extended Lanaye lock facility in Belgium. Based on standardized, rentable system components, Belgian and German PERI engineers adapted the bridge solution to match the range of construction site requirements.
05
Aug
![Nordhavnsvej Tunnel - formwork carriage has been designed so that trucks can pass through Nordhavnsvej Tunnel - The formwork carriage has been designed so that trucks can pass through at any time without obstacles. Due to the cramped site conditions, an absolutely essential requirement for the execution.](https://cdn.peri.cloud/.imaging/mWide/dam/9e73002b-cf8d-4ec3-abff-fed7d8d3712e/73938/nordhavnsvej-tunnel-formwork-carriage-has-been-designed-so-that-trucks-can-pass-through.jpg)
![Nordhavnsvej Tunnel - The slab formwork carriage consists almost entirely of system components Nordhavnsvej Tunnel - The slab formwork carriage for the Nordhavnsvej tunnel project consists almost entirely of system components from the Variokit engineering construction kit – and is therefore extremely cost-effective.](https://cdn.peri.cloud/.imaging/mWide/dam/ccfca9e8-f0c2-4e71-9ad0-d42fd3f9dda2/73938/nordhavnsvej-tunnel-the-slab-formwork-carriage-consists-almost-entirely-of-system-components.jpg)
![Nordhavnsvej Tunnel - mounted Alu 75 site staircase and Prokit EP 110 side protection for safe conditions Nordhavnsvej Tunnel - Everything from one source: PERI has provided a comprehensive solution. Through the mounted Alu 75 site staircase and Prokit EP 110 side protection, safe conditions have also been created for the construction team when using the access points as well as carrying out slab formwork activities.](https://cdn.peri.cloud/.imaging/mWide/dam/f504e55c-d097-4a12-98c2-d3046974a119/73943/nordhavnsvej-tunnel-mounted-alu-75-site-staircase-and-prokit-ep-110-side-protection-for-safe-conditions.jpg)
Customized formwork and scaffolding solution from one source
Around 620 m of the extensive Nordhavnsvej infrastructure project runs underground. The twin-tubed, rectangular tunnel is being realized using the cut-and-cover method – the walls with Trio panelized formwork in advance followed by the slab formed with the Variokit tunnel formwork carriage. With the customized project solution, the construction team has achieved a three week cycle for the 25 m long concreting sections.
01
Jul
![North Station Vienna North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.](https://cdn.peri.cloud/.imaging/mWide/dam/775a671b-07bf-42b6-87cd-9c1eff4e5e16/75575/north-station-vienna.jpg)
![North Station Vienna - one-sided tie installation procedure of MAXIMO panel formwork reduced shuttering times North Station Vienna - The one-sided tie installation procedure of the MAXIMO panel formwork reduced shuttering times as well as ensuring that a neat joint and tie arrangement was achieved.](https://cdn.peri.cloud/.imaging/mWide/dam/b19af50b-99b0-401d-a2c9-ce8b2b188015/75576/north-station-vienna-one-sided-tie-installation-procedure-of-maximo-panel-formwork-reduced-shuttering-times.jpg)
![North Station Vienna - SKYDECK construction with lightweight main beams and panels North Station Vienna - The SKYDECK construction with lightweight main beams and panels provides a systematic assembly sequence and creates space under the formwork.](https://cdn.peri.cloud/.imaging/mPortrait/dam/cb3e6d8c-f69e-4ae8-9ee8-45525fceab01/75574/north-station-vienna-skydeck-construction-with-lightweight-main-beams-and-panels.jpg)
Construction time savings with MAXIMO and SKYDECK
On the former North Station area, the "Schwarzatal" non-profit real estate developer is currently realizing a very special housing project. The use of modern and efficient formwork systems for the walls and slabs ensured that the very tight completion deadline of only 10 months for the building shell could be met.
07
Jun
![PERI Apps make construction site operations easier - More digital solutions in formwork and scaffolding PERI press release - Apps and Tools](https://cdn.peri.cloud/.imaging/mWide/dam/087150aa-5a11-4052-ae19-be972bd3743b/33389/peri-apps-make-construction-site-operations-easier-more-digital-solutions-in-formwork-and-scaffolding.jpg)
Digital solutions with added value
At bauma 2013, PERI presented a number of new digital innovations which included the launch of the PERI handbook as an application for mobile devices. In addition, the company unveiled applications for determining the concreting speed as well as a configurator for the MULTIFLEX slab formwork designed for use on smart phones and tablets.
05
Jun
![The Skyscraper Festival in Frankfurt - group picture PERI UP at the Skyscraper Festival](https://cdn.peri.cloud/.imaging/mPortrait/dam/af771156-c695-43e0-b4d1-5b5c6a4e02a7/33160/the-skyscraper-festival-in-frankfurt-group-picture.jpg)
![The Skyscraper Festival in Frankfurt - trainee scaffolders PERI UP at the Skyscraper Festival](https://cdn.peri.cloud/.imaging/mWide/dam/a48f671e-2189-4c7a-8f52-2f056712283d/33179/the-skyscraper-festival-in-frankfurt-trainee-scaffolders.jpg)
![Free-standing stairway with a height of 15 m Free-standing stairway with a height of 15 m realized on the basis of the PERI UP Rosett Flex modular scaffold](https://cdn.peri.cloud/.imaging/mPortrait/dam/af0080ae-f2bd-4574-8b10-6cff7f2d407b/33177/free-standing-stairway-with-a-height-of-15-m.jpg)
A hugely impressive appearance - PERI UP at the Skyscraper Festival
In May 2013, the fifth Skyscraper Festival in Frankfurt am Main took place. 18 high-rise buildings opened their doors to the general public and countless other programme highlights thrilled and entertained more than a million visitors.
03
Jun
![Grain Silo near Parma - Cost-effective PERI climbing concept Grain Silo near Parma, Italy - Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.](https://cdn.peri.cloud/.imaging/mWide/dam/a8df6e4a-507e-4902-a2fd-11b6a856a0c7/74824/grain-silo-near-parma-cost-effective-peri-climbing-concept.jpg)
![Grain Silo near Parma - PERI CB 240 and CB 160 climbing scaffold systems on the inside and outside Grain Silo near Parma, Italy - Type-tested and a high level of safety in all operational areas: PERI CB 240 and CB 160 climbing scaffold systems on the inside and outside respectively.](https://cdn.peri.cloud/.imaging/mWide/dam/044f24bc-0fcf-47e5-8a55-9e6f1ed8b232/74824/grain-silo-near-parma-peri-cb-240-and-cb-160-climbing-scaffold-systems-on-the-inside-and-outside.jpg)
![Grain Silo near Parma - PERI climbing formwork solution with CB climbing platforms and accurately rounded VARIO GT 24 wall formwork Grain Silo near Parma, Italy - Optimal jobsite results: PERI climbing formwork solution with CB climbing platforms and accurately rounded VARIO GT 24 wall formwork.](https://cdn.peri.cloud/.imaging/mPortrait/dam/ba061f33-f55b-4222-87a7-964ff98a6b68/74821/grain-silo-near-parma-peri-climbing-formwork-solution-with-cb-climbing-platforms-and-accurately-rounded-vario-gt-24-wall-formwork.jpg)
High quality in continuous 2-week cycles
Using a PERI climbing formwork solution precisely tailored to meet the project requirements and reduced material requirements, nine silos grew steadily upwards in regular 2-week cycles. Ready-to-use elements supplied directly from the PERI formwork assembly hall ensured dimensional stability.
03
May
![VARIOKIT tunnel formwork carriage PERI press release - Increased profitability for VARIOKIT tunnel formwork carriage - PERI civil engineering solutions at bauma 2013](https://cdn.peri.cloud/.imaging/mPortrait/dam/de03d134-d9c8-48f3-bdc3-4cf5781218f7/33200/variokit-tunnel-formwork-carriage.jpg)
![VARIOKIT tunnel formwork carriage PERI press release - PERI civil engineering solutions at bauma 2013](https://cdn.peri.cloud/.imaging/mWide/dam/ad68b03f-323e-469f-97da-03f672ac75ee/33198/variokit-tunnel-formwork-carriage.jpg)
![VARIOKIT tunnel formwork carriage PERI press release - PERI civil engineering solutions at bauma 2013](https://cdn.peri.cloud/.imaging/mPortrait/dam/fd32b82a-1b8a-4192-9124-f3fbddaf6f84/33188/variokit-tunnel-formwork-carriage.jpg)
Increased profitability for VARIOKIT tunnel formwork carriage
At this year's bauma, PERI presented new system components and a wide range of further developments for formwork and scaffolding technology. Also the tunnel formwork carriage exhibited at the fair is characterized by detail improvements that have been designed to increase the cost-effectiveness and accelerate the assembly.
03
May
![PERI UP Rosett Flex LGS weather protection roof PERI press release - PERI UP Scaffold Technology at bauma 2013](https://cdn.peri.cloud/.imaging/mWide/dam/5f4889f7-cc58-448b-997c-2776c5790656/33208/peri-up-rosett-flex-lgs-weather-protection-roof.jpg)
![PERI UP Rosett Flex LGS weather protection roof PERI press release - PERI UP Scaffold Technology at bauma 2013](https://cdn.peri.cloud/.imaging/mPortrait/dam/4cc783e7-1b9b-4763-b4d8-271dd6d4f140/33206/peri-up-rosett-flex-lgs-weather-protection-roof.jpg)
![PERI 4-legged heavy-duty prop PERI press release - PERI UP Scaffold Technology at bauma 2013](https://cdn.peri.cloud/.imaging/mPortrait/dam/86947292-a8ed-4cac-866e-c00e4f17bbbc/33161/peri-4-legged-heavy-duty-prop.jpg)
Innovative technology, comprehensive solutions and customer-oriented presentations
The complete range of scaffolding applications was presented along with new system components and numerous further developments. The exhibition offered prospective customers the best opportunity to learn more about the proven and innovative technology as well as PERI services in greater detail. The entire week of the fair in Munich was characterized by an extremely positive feedback from the industry.
02
May
![PERI stand at bauma 2013 PERI press release - PERI at bauma 2013](https://cdn.peri.cloud/.imaging/mWide/dam/65da5af1-aee9-4892-b79d-1de5bfb25122/33211/peri-stand-at-bauma-2013.jpg)
![PERI stand at bauma 2013 PERI press release - PERI at bauma 2013](https://cdn.peri.cloud/.imaging/mWide/dam/7c9dd951-9ab5-4802-96da-0717863312fe/33209/peri-stand-at-bauma-2013.jpg)
![PERI Stand at bauma 2013 with MAXIMO panel formwork PERI press release - PERI at bauma 2013](https://cdn.peri.cloud/.imaging/mWide/dam/5bc01cd8-d45f-4d65-864b-451e8da8baab/33216/peri-stand-at-bauma-2013-with-maximo-panel-formwork.jpg)
Impressive performance with extremely positive feedback at the world´s biggest fair
More than 530,000 visitors from over 200 countries attended bauma 2013. Every third visitor to the fair visited the purpose-built PERI exhibition hall which was located on the Open-Air Area North. On over 4,000 square metres, the Weissenhorn-based company presented proven formwork and scaffolding systems as well as numerous innovations.
23
Apr
![bauma 2013 - Wall Formwork The MAXIMO with the one-sided installed tie technology continued to be the centre of attention of the wall formwork.](https://cdn.peri.cloud/.imaging/mWide/dam/ac926bd6-cc2d-4846-9120-6a23e04a5897/33365/bauma-2013-wall-formwork.jpg)
Innovative technology, comprehensive solutions and customer-oriented presentations at bauma 2013
At this year´s bauma, PERI presented a number of new formwork and scaffolding systems as well as a wide range of further developments. On an area of over 4,000 m², the exhibition offered visitors the opportunity to learn more about proven and innovative technology at first hand.
15
Apr
![Banco de la Ciudad de Buenos Aires - standardized construction kit system Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.](https://cdn.peri.cloud/.imaging/mWide/dam/6a7bfa9e-0e3f-4c2f-9f52-2846221b68a0/74029/banco-de-la-ciudad-de-buenos-aires-standardized-construction-kit-system.jpg)
![Banco de la Ciudad de Buenos Aires - Rentable VARIOKIT and MULTIPROP system components Banco de la Ciudad de Buenos Aires - Rentable VARIOKIT and MULTIPROP system components form the site-compliant basis for the movable, form-giving slab tables.](https://cdn.peri.cloud/.imaging/mWide/dam/6fb6efad-4437-4147-b596-e765696523c7/74030/banco-de-la-ciudad-de-buenos-aires-rentable-variokit-and-multiprop-system-components.jpg)
![Banco de la Ciudad de Buenos Aires - PERI UP Rosett Flex scaffolding Banco de la Ciudad de Buenos Aires - Due to the metric basic grid dimensions, the PERI UP Rosett Flex scaffolding sub-structure could be optimally adapted to suit the different contact areas.](https://cdn.peri.cloud/.imaging/mWide/dam/0c971ae9-7f54-4df1-9090-e62eba259280/74019/banco-de-la-ciudad-de-buenos-aires-peri-up-rosett-flex-scaffolding.jpg)
Undulating roof construction efficiently formed
An undulating roof structure is being formed by means of longitudinally movable slab tables at a height of 20 m. The project solution developed by PERI´s Argentine engineers fulfils the high architectural concrete requirements as well as maintaining the short construction period from an economic point of view.
04
Mar
![Evolution Tower - Inclined and crane-independently climbed RCS protection panel units Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.](https://cdn.peri.cloud/.imaging/mPortrait/dam/e92aa988-8f48-420e-b8c5-8293b516d5a2/75512/evolution-tower-inclined-and-crane-independently-climbed-rcs-protection-panel-units.jpg)
![Evolution Tower Moskau - City Palace Tower or Wedding Tower Evolution Tower Moskau - The Evolution Tower is also known as the “City Palace Tower” or the “Wedding Palace”.](https://cdn.peri.cloud/.imaging/mWide/dam/baea91cf-54cd-40c8-873c-e3610b042638/75509/evolution-tower-moskau-city-palace-tower-or-wedding-tower.jpg)
![Evolution Tower - VARIO girder wall formwork for the core walls climbed with help of the ACS self-climbing system Evolution Tower, Moscow, Russia - VARIO girder wall formwork for the core walls climbed with help of the ACS self-climbing system in regular weekly cycles with 4.30 m concreting cycle heights.](https://cdn.peri.cloud/.imaging/mWide/dam/ba344012-49f4-457f-ad8d-93b866f248a2/75595/evolution-tower-vario-girder-wall-formwork-for-the-core-walls-climbed-with-help-of-the-acs-self-climbing-system.jpg)
Twisted floors in weekly cycles
Every week, Moscow´s new landmark is gaining 4.30 m in height – with each completed floor twisted 3° in relation to the preceding one. For this, PERI engineers developed a crane-independent formwork concept on the basis of the RCS and ACS self-climbing technology.
04
Feb
![Hongkong-Zhuhai-Macao Bridge - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances. Hongkong-Zhuhai-Macao Bridge (HZMB), China - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances.](https://cdn.peri.cloud/.imaging/mWide/dam/8c7ceca8-b644-45ca-83dd-a8ed07e42236/73869/hongkong-zhuhai-macao-bridge-the-180-m-long-tunnel-elements-are-cast-in-eight-individual-segments-each-22-50-m-long-%E2%80%93-monolithic-without-ties-and-in-compliance-with-strict-dimensional-tolerances.jpg)
![Hongkong-Zhuhai-Macao Bridge - The internal formwork moves hydraulically over the launching beam into the reinforcement cages Hongkong-Zhuhai-Macao Bridge (HZMB), China - The internal formwork moves hydraulically over the launching beam into the reinforcement cages.](https://cdn.peri.cloud/.imaging/mWide/dam/efd29b31-8b58-4ac4-b81f-3f6192f00700/73870/hongkong-zhuhai-macao-bridge-the-internal-formwork-moves-hydraulically-over-the-launching-beam-into-the-reinforcement-cages.jpg)
![Hongkong-Zhuhai-Macao Bridge - A total of 33 tunnel elements will be produced Hongkong-Zhuhai-Macao Bridge (HZMB), China - A total of 33 tunnel elements will be produced using two production lines: each 180 m long, 38 m wide, 11.40 m high and weighing 72,000 t.](https://cdn.peri.cloud/.imaging/mWide/dam/29aa160d-cd96-4e9e-9575-d1091ee98021/73859/hongkong-zhuhai-macao-bridge-a-total-of-33-tunnel-elements-will-be-produced.jpg)
Incremental launching forming machine for the world´s longest underwater tunnel
With the help of PERI know-how, the longest underwater tunnel in the world is currently under construction in China. Two hydraulically-operated shuttering machines are being used for the efficient realization of 33 tunnel elements by means of the incremental launching method. Each standard element is an incredible 180 m long and weighs over 70,000 t.
16
Jan
![Construction-compliant accessories for the PROKIT safety system PERI press release - PROKIT safety system](https://cdn.peri.cloud/.imaging/mWide/dam/d821ec30-0e94-435a-bd54-f49e71021423/33347/construction-compliant-accessories-for-the-prokit-safety-system.jpg)
![Construction-compliant accessories for the PROKIT safety system PERI press release - PROKIT side mesh barriers](https://cdn.peri.cloud/.imaging/mWide/dam/3a7c1d09-f514-48b3-a081-cc324cd1c9e8/33345/construction-compliant-accessories-for-the-prokit-safety-system.jpg)
![Construction-compliant accessories for the PROKIT safety system PERI press release - PROKIT safety system](https://cdn.peri.cloud/.imaging/mPortrait/dam/fb80fbb6-0d1d-449a-b7d8-97dc0b666026/33352/construction-compliant-accessories-for-the-prokit-safety-system.jpg)
Construction-compliant accessories for the PROKIT safety system
For the PROKIT EP 110 safety system, additional system components are now available: a pallet which greatly facilitates logistics operations for the side mesh barrier as well as a plastic screw-on sleeve that is used for easy mounting of the slab feet.
07
Jan
![CaixaForum, Zaragoza, Spain The CaixaForum in Zaragoza resembles a sculpture and serves as a cultural meeting place.](https://cdn.peri.cloud/.imaging/mWide/dam/88ed1dff-8c09-4fbc-b6cb-c2b9af5951a0/33397/caixaforum-zaragoza-spain.jpg)
![CaixaForum, Zaragoza, Spain The angular arranged shear walls are up to 37 metres high and are obliquely-cut in part in the bottom third of the structure.](https://cdn.peri.cloud/.imaging/mWide/dam/3a7347ca-c67c-4c26-829d-8bbeca8833ee/33356/caixaforum-zaragoza-spain.jpg)
![CaixaForum, Zaragoza, Spain PERI CB 240 framework brackets are connected with TRIO panel formwork to form large-sized climbing formwork units.](https://cdn.peri.cloud/.imaging/mPortrait/dam/957951b6-7d1c-463e-b1cd-cbf6d34cb67b/33354/caixaforum-zaragoza-spain.jpg)